Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

TransPennine Express at Hebden Bridge

All trains at Hebden BridgeTransPennine Express across BritainYorkshire and The Humber

On time, last 13 periods61.1%Whole station: 60.2%
Cancelled2.3%Whole station: 2.5%
Scheduled stops2,047Of 49,610 at the station

How this operator is doing here

TransPennine Express had 2,047 scheduled stops at Hebden Bridge in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 61.1% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.

TransPennine Express trains at Hebden Bridge also serve Mytholmroyd (2.0 km south-east, 61.7% on time, 2.4% cancelled), Todmorden (6.5 km south-west, 59.4% on time, 2.4% cancelled), Sowerby Bridge (7.5 km south-east, 60.7% on time, 2.4% cancelled), Slaithwaite (15.2 km south-east, 64.5% on time, 2.9% cancelled), Brighouse (15.7 km east, 64.7% on time, 3.1% cancelled) and Marsden (Yorks) (15.8 km south, 67.2% on time, 2.8% cancelled), which are the stations on its network closest to Hebden Bridge.

Within 30 km of here, TransPennine Express runs best at Stalybridge, 28.4 km south (69.7%), and worst at Huddersfield, 17.8 km south-east (61.3%).

The busiest TransPennine Express station within 30 km of Hebden Bridge is Huddersfield, 17.8 km south-east, with about 133 scheduled stops a day.

Of the 2 operators with enough records at Hebden Bridge, TransPennine Express is the most punctual, at 61.1%.

Cancellations of TransPennine Express at Hebden Bridge are near its usual level: 2.3% of scheduled stops, against 3.3% across its network and 2.5% for every operator at the station.

Period by period

40%60%80%2023-242024-252025-262026-27Period 3 of 2025-26: 72.2%Period 4 of 2025-26: 60.0%Period 5 of 2025-26: 68.5%Period 6 of 2025-26: 63.2%Period 7 of 2025-26: 53.5%Period 10 of 2025-26: 82.8%Period 1 of 2026-27: 47.4%Period 2 of 2026-27: 56.4%Period 3 of 2026-27: 82.4%Period 4 of 2026-27: 40.0%Period 5 of 2026-27: 73.5%Period 6 of 2026-27: 84.4%Period 7 of 2026-27: 50.0%
This pageGreat Britain
0%5%10%15%20%Period 3 of 2025-26: 1.8%Period 4 of 2025-26: 3.0%Period 5 of 2025-26: 17.2%Period 6 of 2025-26: 3.0%Period 7 of 2025-26: 0.5%Period 10 of 2025-26: 0.0%Period 1 of 2026-27: 3.6%Period 2 of 2026-27: 1.3%Period 3 of 2026-27: 1.8%Period 4 of 2026-27: 8.4%Period 5 of 2026-27: 6.2%Period 6 of 2026-27: 1.2%Period 7 of 2026-27: 1.0%2023-242024-252025-262026-27

See how TransPennine Express Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2740050.0%1.0%
Period 6 of 2026-2716984.4%1.2%
Period 5 of 2026-2717773.5%6.2%
Period 4 of 2026-2713140.0%8.4%
Period 3 of 2026-2722582.4%1.8%
Period 2 of 2026-2767756.4%1.3%
Period 1 of 2026-2714047.4%3.6%
Period 13 of 2025-260––
Period 12 of 2025-2635––
Period 11 of 2025-2634––
Period 10 of 2025-265882.8%0.0%
Period 9 of 2025-261––
Period 8 of 2025-260––

Other operators at Hebden Bridge

OperatorScheduled stopsWithin 3 minCancelled
Northern47,56360.2%2.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out