Elizabeth line at Heathrow Terminals 2 and 3 (Rail Station Only)
All trains at Heathrow Terminals 2 and 3 (Rail Station Only)Elizabeth line across BritainLondon
How this operator is doing here
Elizabeth line had 77,095 scheduled stops at Heathrow Terminals 2 and 3 (Rail Station Only) in the 13 periods to Period 7 of 2026-27, 58% of the station's total. 88.0% of recorded arrivals came within three minutes and 6.2% of stops were cancelled.
Elizabeth line trains at Heathrow Terminals 2 and 3 (Rail Station Only) also serve Heathrow Terminal 4 (Rail Station Only) (1.5 km south, 91.1% on time, 5.2% cancelled), Heathrow Terminal 5 (Rail Station Only) (2.3 km west, 91.0% on time, 7.7% cancelled), Hayes and Harlington (4.2 km north-east, 85.5% on time, 4.8% cancelled), West Drayton (4.4 km north, 84.9% on time, 4.1% cancelled), Iver (5.4 km north-west, 84.0% on time, 4.7% cancelled) and Southall (6.5 km north-east, 86.5% on time, 3.9% cancelled), which are the stations on its network closest to Heathrow Terminals 2 and 3 (Rail Station Only).
Within 30 km of here, Elizabeth line runs best at London Liverpool Street, 26.3 km east (92.5%), and worst at Twyford, 28.3 km west (82.7%).
The busiest Elizabeth line station within 30 km of Heathrow Terminals 2 and 3 (Rail Station Only) is London Paddington, 19.8 km east, with about 644 scheduled stops a day.
Of the 2 operators with enough records at Heathrow Terminals 2 and 3 (Rail Station Only), Elizabeth line is the most punctual, at 88.0%.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,973 | 89.7% | 4.9% |
| Period 6 of 2026-27 | 5,535 | 89.2% | 5.6% |
| Period 5 of 2026-27 | 6,027 | 87.8% | 13.4% |
| Period 4 of 2026-27 | 5,961 | 90.7% | 3.7% |
| Period 3 of 2026-27 | 5,706 | 88.8% | 9.4% |
| Period 2 of 2026-27 | 5,964 | 89.0% | 6.0% |
| Period 1 of 2026-27 | 6,701 | 88.9% | 5.6% |
| Period 13 of 2025-26 | 6,461 | 88.9% | 3.4% |
| Period 12 of 2025-26 | 5,915 | 88.4% | 4.6% |
| Period 11 of 2025-26 | 5,927 | 88.2% | 7.9% |
| Period 10 of 2025-26 | 5,510 | 88.7% | 4.4% |
| Period 9 of 2025-26 | 5,546 | 81.9% | 5.3% |
| Period 8 of 2025-26 | 5,869 | 82.8% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Heathrow Terminals 2 and 3 (Rail Station Only)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Express | 54,747 | 87.8% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out