Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Havant

All trains at HavantGTR across BritainSouth East

On time, last 13 periods75.0%Whole station: 74.5%
Cancelled5.6%Whole station: 4.5%
Scheduled stops57,819Of 92,820 at the station

How this operator is doing here

GTR had 57,819 scheduled stops at Havant in the 13 periods to Period 7 of 2026-27, 62% of the station's total. 75.0% of recorded arrivals came within three minutes and 5.6% of stops were cancelled.

GTR trains at Havant also serve Warblington (1.0 km east, 75.1% on time, 6.1% cancelled), Bedhampton (1.0 km west, 75.1% on time, 5.0% cancelled), Emsworth (3.0 km east, 76.7% on time, 5.8% cancelled), Southbourne (5.2 km east, 75.8% on time, 5.9% cancelled), Hilsea (6.2 km south-west, 78.6% on time, 7.1% cancelled) and Cosham (6.2 km west, 75.5% on time, 5.7% cancelled), which are the stations on its network closest to Havant.

Within 30 km of here, GTR runs best at Bognor Regis, 22.7 km east (89.2%), and worst at Bosham, 9.5 km east (71.6%).

The busiest GTR station within 30 km of Havant is Barnham, 24.1 km east, with about 331 scheduled stops a day.

Of the 2 operators with enough records at Havant, GTR is the most punctual, at 75.0%.

GTR at Havant has slipped sharply. 75.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.1 percentage points worse than the 80.1% recorded in the 13 before. Cancellations rose to 5.6% of scheduled stops from 4.7%, which is 0.9 percentage points more.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 83.8%Period 2 of 2023-24: 81.6%Period 3 of 2023-24: 75.7%Period 4 of 2023-24: 71.3%Period 5 of 2023-24: 77.6%Period 6 of 2023-24: 81.5%Period 7 of 2023-24: 75.9%Period 8 of 2023-24: 65.9%Period 9 of 2023-24: 66.0%Period 10 of 2023-24: 72.6%Period 11 of 2023-24: 77.3%Period 12 of 2023-24: 79.8%Period 13 of 2023-24: 83.7%Period 1 of 2024-25: 76.6%Period 2 of 2024-25: 77.1%Period 3 of 2024-25: 81.8%Period 4 of 2024-25: 82.3%Period 5 of 2024-25: 82.3%Period 6 of 2024-25: 80.4%Period 7 of 2024-25: 81.7%Period 8 of 2024-25: 78.1%Period 9 of 2024-25: 71.6%Period 10 of 2024-25: 78.4%Period 11 of 2024-25: 81.2%Period 12 of 2024-25: 80.3%Period 13 of 2024-25: 82.9%Period 1 of 2025-26: 84.4%Period 2 of 2025-26: 84.0%Period 3 of 2025-26: 83.0%Period 4 of 2025-26: 75.5%Period 5 of 2025-26: 80.1%Period 6 of 2025-26: 81.0%Period 7 of 2025-26: 80.0%Period 8 of 2025-26: 76.4%Period 9 of 2025-26: 71.1%Period 10 of 2025-26: 74.2%Period 11 of 2025-26: 79.9%Period 12 of 2025-26: 78.9%Period 13 of 2025-26: 81.6%Period 1 of 2026-27: 80.6%Period 2 of 2026-27: 78.0%Period 3 of 2026-27: 76.3%Period 4 of 2026-27: 75.8%Period 5 of 2026-27: 68.0%Period 6 of 2026-27: 63.2%Period 7 of 2026-27: 68.4%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.7%Period 2 of 2023-24: 7.1%Period 3 of 2023-24: 4.4%Period 4 of 2023-24: 7.1%Period 5 of 2023-24: 2.5%Period 6 of 2023-24: 4.2%Period 7 of 2023-24: 2.6%Period 8 of 2023-24: 3.9%Period 9 of 2023-24: 3.7%Period 10 of 2023-24: 10.8%Period 11 of 2023-24: 2.3%Period 12 of 2023-24: 3.7%Period 13 of 2023-24: 2.8%Period 1 of 2024-25: 6.6%Period 2 of 2024-25: 4.0%Period 3 of 2024-25: 6.3%Period 4 of 2024-25: 2.5%Period 5 of 2024-25: 3.0%Period 6 of 2024-25: 3.7%Period 7 of 2024-25: 5.4%Period 8 of 2024-25: 4.6%Period 9 of 2024-25: 5.1%Period 10 of 2024-25: 4.0%Period 11 of 2024-25: 4.6%Period 12 of 2024-25: 5.1%Period 13 of 2024-25: 4.2%Period 1 of 2025-26: 3.1%Period 2 of 2025-26: 3.0%Period 3 of 2025-26: 5.3%Period 4 of 2025-26: 8.2%Period 5 of 2025-26: 4.1%Period 6 of 2025-26: 4.1%Period 7 of 2025-26: 5.0%Period 8 of 2025-26: 5.5%Period 9 of 2025-26: 5.4%Period 10 of 2025-26: 6.3%Period 11 of 2025-26: 6.0%Period 12 of 2025-26: 4.5%Period 13 of 2025-26: 5.7%Period 1 of 2026-27: 4.1%Period 2 of 2026-27: 8.3%Period 3 of 2026-27: 6.8%Period 4 of 2026-27: 5.1%Period 5 of 2026-27: 5.5%Period 6 of 2026-27: 5.0%Period 7 of 2026-27: 4.6%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-274,49268.4%4.6%
Period 6 of 2026-273,78063.2%5.0%
Period 5 of 2026-274,53468.0%5.5%
Period 4 of 2026-274,53775.8%5.1%
Period 3 of 2026-274,30776.3%6.8%
Period 2 of 2026-274,38678.0%8.3%
Period 1 of 2026-275,05680.6%4.1%
Period 13 of 2025-264,83081.6%5.7%
Period 12 of 2025-264,26878.9%4.5%
Period 11 of 2025-264,54779.9%6.0%
Period 10 of 2025-264,05374.2%6.3%
Period 9 of 2025-264,51571.1%5.4%
Period 8 of 2025-264,51476.4%5.5%

Time of year

70%80%90%P1: 81.5%1P2: 80.3%2P3: 79.3%3P4: 76.5%4P5: 77.0%5P6: 77.0%6P7: 76.5%7P8: 73.4%8P9: 69.8%9P10: 75.1%10P11: 79.5%11P12: 79.7%12P13: 82.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Havant

OperatorScheduled stopsWithin 3 minCancelled
South Western Railway35,00173.6%2.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out