Chiltern Railways at Hatton
All trains at HattonChiltern Railways across BritainWest Midlands
How this operator is doing here
Chiltern Railways had 11,826 scheduled stops at Hatton in the 13 periods to Period 7 of 2026-27, 92% of the station's total. 85.2% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
Chiltern Railways trains at Hatton also serve Claverdon (2.6 km south-west, 90.1% on time, 1.1% cancelled), Warwick Parkway (4.3 km east, 82.7% on time, 1.1% cancelled), Warwick (6.2 km east, 84.4% on time, 1.1% cancelled), Lapworth (6.3 km north-west, 82.4% on time, 1.3% cancelled), Bearley (7.7 km south-west, 90.4% on time, 1.1% cancelled) and Leamington Spa (9.4 km east, 83.1% on time, 1.2% cancelled), which are the stations on its network closest to Hatton.
Within 30 km of here, Chiltern Railways runs best at Stratford-upon-Avon Parkway, 10.6 km south (92.7%), and worst at Lapworth, 6.3 km north-west (82.4%).
The busiest Chiltern Railways station within 30 km of Hatton is Leamington Spa, 9.4 km east, with about 81 scheduled stops a day.
Of the 2 operators with enough records at Hatton, Chiltern Railways is the most punctual, at 85.2%.
For Chiltern Railways, Hatton is the 40th best of 51 ranked stations. Its 85.2% here is 2.5 percentage points below the 87.7% across the whole network.
Period by period
See how Chiltern Railways Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 919 | 81.1% | 0.4% |
| Period 6 of 2026-27 | 977 | 80.4% | 0.7% |
| Period 5 of 2026-27 | 951 | 79.2% | 0.8% |
| Period 4 of 2026-27 | 962 | 79.1% | 2.3% |
| Period 3 of 2026-27 | 795 | 84.4% | 0.6% |
| Period 2 of 2026-27 | 946 | 84.3% | 2.3% |
| Period 1 of 2026-27 | 912 | 91.7% | 0.7% |
| Period 13 of 2025-26 | 1,071 | 89.5% | 0.7% |
| Period 12 of 2025-26 | 976 | 90.7% | 1.1% |
| Period 11 of 2025-26 | 861 | 91.3% | 1.2% |
| Period 10 of 2025-26 | 621 | 87.1% | 0.3% |
| Period 9 of 2025-26 | 972 | 85.2% | 1.2% |
| Period 8 of 2025-26 | 863 | 84.5% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hatton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 966 | 85.0% | 6.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out