West Midlands Railway at Hatton
All trains at HattonWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 966 scheduled stops at Hatton in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 85.0% of recorded arrivals came within three minutes and 6.2% of stops were cancelled.
West Midlands Railway trains at Hatton also serve Claverdon (2.6 km south-west, 89.7% on time, 5.5% cancelled), Warwick Parkway (4.3 km east, 85.2% on time, 5.7% cancelled), Warwick (6.2 km east, 86.9% on time, 5.7% cancelled), Lapworth (6.3 km north-west, 87.6% on time, 4.7% cancelled), Henley-in-Arden (7.6 km west, 84.9% on time, 3.6% cancelled) and Bearley (7.7 km south-west, 89.4% on time, 5.4% cancelled), which are the stations on its network closest to Hatton.
Within 30 km of here, West Midlands Railway runs best at Tyseley, 20.9 km north-west (92.4%), and worst at Hampton-in-Arden, 14.9 km north (67.2%).
The busiest West Midlands Railway station within 30 km of Hatton is Birmingham New Street, 25.4 km north-west, with about 532 scheduled stops a day.
Of the 2 operators with enough records at Hatton, West Midlands Railway is the least punctual, at 85.0%.
For West Midlands Railway, Hatton is the 70th best of 169 ranked stations. Its 85.0% here is 3.9 percentage points above the 81.1% across the whole network.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 76 | 84.9% | 3.9% |
| Period 6 of 2026-27 | 76 | 87.3% | 6.6% |
| Period 5 of 2026-27 | 60 | 88.9% | 10.0% |
| Period 4 of 2026-27 | 69 | 83.3% | 4.3% |
| Period 3 of 2026-27 | 75 | 77.8% | 4.0% |
| Period 2 of 2026-27 | 69 | 87.9% | 4.3% |
| Period 1 of 2026-27 | 89 | 83.3% | 5.6% |
| Period 13 of 2025-26 | 82 | 86.8% | 7.3% |
| Period 12 of 2025-26 | 76 | 91.9% | 2.6% |
| Period 11 of 2025-26 | 74 | 90.0% | 5.4% |
| Period 10 of 2025-26 | 67 | 78.6% | 16.4% |
| Period 9 of 2025-26 | 76 | 83.6% | 3.9% |
| Period 8 of 2025-26 | 77 | 80.3% | 7.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hatton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 11,826 | 85.2% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out