Harrow-on-the-Hill
HOHLondonManaged by London Underground
How this station is performing
Harrow-on-the-Hill had 19,323 scheduled stops to Period 7 of 2026-27, about 53 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Harrow-on-the-Hill opened on 2 August 1880, 146 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrow and Wealdstone is the oldest (1837) and South Kenton the newest (1933), with Harrow-on-the-Hill in between.
The nearest stations to Harrow-on-the-Hill are Kenton (1.4 km east), Harrow and Wealdstone (1.4 km north), South Kenton (2.2 km south-east), Sudbury Hill Harrow (2.3 km south) and Northolt Park (2.9 km south-west). 38 stations lie within 10 km in all. Of the five, Sudbury Hill Harrow is the most punctual at 90.2% and Harrow and Wealdstone the least at 83.5%, with Harrow-on-the-Hill on 88.2%.
Harrow-on-the-Hill is named after Harrow on the Hill, an area of London, home to about 12,270 people, but the station stands 1.5 km from its centre.
The time of year matters a great deal for Harrow-on-the-Hill. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 82.8%, while period 13 (March) is the strongest at 93.6%, a spread of 10.8 percentage points.
2 of 3 stations of a similar size in London are more punctual than Harrow-on-the-Hill on 88.2%. The comparison group includes Birkbeck (98.1%), Greenford (96.8%) and Berrylands (84.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 19,323 | 88.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Harrow-on-the-Hill? Delay Repay
These operators call at Harrow-on-the-Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 83.3% | 1.4% |
| Period 6 of 2026-27 | 1,622 | 88.0% | 4.4% |
| Period 5 of 2026-27 | 1,584 | 89.1% | 1.3% |
| Period 4 of 2026-27 | 1,576 | 88.3% | 0.7% |
| Period 3 of 2026-27 | 1,278 | 87.9% | 2.2% |
| Period 2 of 2026-27 | 1,466 | 90.0% | 0.6% |
| Period 1 of 2026-27 | 1,486 | 92.5% | 0.9% |
| Period 13 of 2025-26 | 1,645 | 91.8% | 1.3% |
| Period 12 of 2025-26 | 1,428 | 91.2% | 0.4% |
| Period 11 of 2025-26 | 1,532 | 90.2% | 2.5% |
| Period 10 of 2025-26 | 1,036 | 87.9% | 1.7% |
| Period 9 of 2025-26 | 1,633 | 82.8% | 1.7% |
| Period 8 of 2025-26 | 1,445 | 83.5% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birkbeck | 19,535 | 98.1% | 2.8% |
| Greenford | 20,210 | 96.8% | 4.3% |
| Berrylands | 16,377 | 84.8% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out