Greenford
GFDLondonManaged by London Underground
How this station is performing
Greenford had 20,210 scheduled stops to Period 7 of 2026-27, about 56 a day. 96.8% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Greenford opened on 1 October 1904, 122 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Greenford is the oldest; the next oldest, Castle Bar Park, dates from 1904.
The nearest stations to Greenford are South Greenford (1.1 km south-east), Sudbury Hill Harrow (1.9 km north), Northolt Park (2.0 km north-west), Castle Bar Park (2.3 km south-east) and Sudbury and Harrow Road (2.4 km north-east). 51 stations lie within 10 km in all. Of the five, South Greenford is the most punctual at 97.3% and Northolt Park the least at 89.4%, with Greenford on 96.8%.
Greenford takes its name from an area of London called Greenford, home to about 46,787 people, and the station stands 1.8 km from its centre.
Greenford is among the most punctual stations in Britain. Its 96.8% puts it 37th out of 2,374 ranked stations, with 36 ahead of it and 2,337 behind, and 12.9 percentage points above the national median of 83.9%.
1 of 3 stations of a similar size in London are more punctual than Greenford on 96.8%. The comparison group includes Birkbeck (98.1%), Harrow-on-the-Hill (88.2%) and South Merton (83.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,210 | 96.8% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Greenford? Delay Repay
These operators call at Greenford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,536 | 94.9% | 7.5% |
| Period 6 of 2026-27 | 1,536 | 89.8% | 5.1% |
| Period 5 of 2026-27 | 1,536 | 97.8% | 9.6% |
| Period 4 of 2026-27 | 1,536 | 96.7% | 4.2% |
| Period 3 of 2026-27 | 1,536 | 95.8% | 4.6% |
| Period 2 of 2026-27 | 1,536 | 93.8% | 3.9% |
| Period 1 of 2026-27 | 1,792 | 98.1% | 3.3% |
| Period 13 of 2025-26 | 1,664 | 99.0% | 1.1% |
| Period 12 of 2025-26 | 1,536 | 97.7% | 2.1% |
| Period 11 of 2025-26 | 1,536 | 98.1% | 4.6% |
| Period 10 of 2025-26 | 1,394 | 98.7% | 3.8% |
| Period 9 of 2025-26 | 1,536 | 98.6% | 4.6% |
| Period 8 of 2025-26 | 1,536 | 98.8% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birkbeck | 19,535 | 98.1% | 2.8% |
| Harrow-on-the-Hill | 19,323 | 88.2% | 1.6% |
| South Merton | 23,713 | 83.0% | 9.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out