Burley-in-Wharfedale
BUWYorkshire and The HumberManaged by Northern Trains
How this station is performing
Burley-in-Wharfedale had 42,737 scheduled stops to Period 7 of 2026-27, about 117 a day. 86.3% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Burley-in-Wharfedale opened on 1 August 1865, 161 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Burley-in-Wharfedale is the oldest; the next oldest, Guiseley, dates from 1865.
The nearest stations to Burley-in-Wharfedale are Menston (2.1 km south-east), Ben Rhydding (3.5 km north-west), Guiseley (4.4 km south-east), Ilkley (4.8 km north-west) and Baildon (6.4 km south). 11 stations lie within 10 km in all. Of the five, Ilkley is the most punctual at 92.0% and Ben Rhydding the least at 86.0%, with Burley-in-Wharfedale on 86.3%.
Burley-in-Wharfedale is named after Burley in Wharfedale, a Village, home to about 7,041 people, but the station stands 0.7 km from its centre.
Across the whole run of data, the weakest four-week period for Burley-in-Wharfedale was Period 9 of 2023-24, at 65.5%, some time before the latest year. The strongest was Period 5 of 2026-27, at 91.3%, and the two are 25.8 percentage points apart. Cancellations peaked at 8.7% of scheduled stops in Period 10 of 2023-24, against 1.4% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Burley-in-Wharfedale on 86.3%. The comparison group includes Ben Rhydding (86.0%), Ilkley (92.0%) and Menston (88.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 42,737 | 86.3% | 1.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,282 | 91.1% | 0.3% |
| Period 6 of 2026-27 | 3,284 | 90.7% | 1.6% |
| Period 5 of 2026-27 | 3,217 | 91.3% | 1.5% |
| Period 4 of 2026-27 | 2,947 | 91.2% | 1.7% |
| Period 3 of 2026-27 | 3,272 | 88.9% | 2.4% |
| Period 2 of 2026-27 | 3,284 | 88.1% | 1.1% |
| Period 1 of 2026-27 | 3,754 | 88.3% | 2.1% |
| Period 13 of 2025-26 | 3,597 | 89.7% | 0.3% |
| Period 12 of 2025-26 | 3,280 | 87.5% | 0.7% |
| Period 11 of 2025-26 | 3,284 | 84.1% | 1.2% |
| Period 10 of 2025-26 | 2,978 | 80.3% | 1.1% |
| Period 9 of 2025-26 | 3,274 | 72.8% | 2.0% |
| Period 8 of 2025-26 | 3,284 | 76.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ben Rhydding | 42,737 | 86.0% | 1.4% |
| Ilkley | 42,737 | 92.0% | 1.3% |
| Menston | 42,737 | 88.5% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out