Gospel Oak
GPOLondonManaged by London Overground
How this station is performing
Gospel Oak had 152,525 scheduled stops to Period 7 of 2026-27, about 419 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 6.5% of scheduled stops were cancelled.
Gospel Oak opened on 2 January 1860, 166 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Gospel Oak is the oldest; the next oldest, Hampstead Heath, dates from 1860.
The nearest stations to Gospel Oak are Hampstead Heath (1.0 km west), Kentish Town West (1.0 km south), Kentish Town (1.1 km south-east), Camden Road (1.7 km south-east) and Upper Holloway (1.8 km north-east). 108 stations lie within 10 km in all. Of the five, Upper Holloway is the most punctual at 94.7% and Hampstead Heath the least at 77.5%, with Gospel Oak on 85.8%.
Gospel Oak takes its name from an area of London called Gospel Oak, and the station stands 0.3 km from its centre.
Cancellations are a particular problem at Gospel Oak. 6.5% of scheduled stops did not happen, 2.4 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2291st of 2,374.
1 of 3 stations of a similar size in London are more punctual than Gospel Oak on 85.8%. The comparison group includes Earlsfield (81.2%), Peckham Rye (89.5%) and City Thameslink (77.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 152,525 | 85.8% | 6.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 12,123 | 88.7% | 4.5% |
| Period 6 of 2026-27 | 11,750 | 84.8% | 9.0% |
| Period 5 of 2026-27 | 11,965 | 87.0% | 12.9% |
| Period 4 of 2026-27 | 12,026 | 82.5% | 11.0% |
| Period 3 of 2026-27 | 10,964 | 83.9% | 5.8% |
| Period 2 of 2026-27 | 12,008 | 85.1% | 9.7% |
| Period 1 of 2026-27 | 13,828 | 89.5% | 2.8% |
| Period 13 of 2025-26 | 13,012 | 89.6% | 2.6% |
| Period 12 of 2025-26 | 11,391 | 88.1% | 3.9% |
| Period 11 of 2025-26 | 11,168 | 87.3% | 5.3% |
| Period 10 of 2025-26 | 9,304 | 87.0% | 5.5% |
| Period 9 of 2025-26 | 11,311 | 78.3% | 7.5% |
| Period 8 of 2025-26 | 11,675 | 82.2% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Earlsfield | 152,922 | 81.2% | 5.2% |
| Peckham Rye | 153,734 | 89.5% | 3.5% |
| City Thameslink | 151,068 | 77.2% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out