City Thameslink
CTKLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
City Thameslink had 151,068 scheduled stops to Period 7 of 2026-27, about 415 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
City Thameslink opened on 29 May 1990, 36 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, City Thameslink is the newest; the oldest, Farringdon, opened in 1863.
The nearest stations to City Thameslink are London Blackfriars (0.5 km south), Farringdon (0.6 km north), London Cannon Street (1.0 km south-east), Moorgate (1.1 km east) and London Waterloo East (1.2 km south). 138 stations lie within 10 km in all. At 77.2%, City Thameslink is less punctual than all of them; the best of the five, London Cannon Street, manages 89.3%.
Cancellations are a particular problem at City Thameslink. 5.8% of scheduled stops did not happen, 2.1 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2221st of 2,374.
Compared with 3 stations of a similar size in London, City Thameslink is the least punctual, at 77.2%. All of them are ahead, including Tottenham Hale (90.3%), Gospel Oak (85.8%) and Earlsfield (81.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 151,068 | 77.2% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at City Thameslink? Delay Repay
These operators call at City Thameslink and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 12,109 | 71.6% | 3.7% |
| Period 6 of 2026-27 | 11,648 | 71.5% | 7.4% |
| Period 5 of 2026-27 | 11,263 | 72.6% | 7.5% |
| Period 4 of 2026-27 | 11,788 | 74.0% | 6.5% |
| Period 3 of 2026-27 | 10,121 | 76.2% | 5.5% |
| Period 2 of 2026-27 | 10,655 | 82.7% | 4.5% |
| Period 1 of 2026-27 | 13,157 | 84.2% | 4.3% |
| Period 13 of 2025-26 | 13,164 | 84.1% | 2.6% |
| Period 12 of 2025-26 | 11,949 | 81.2% | 6.3% |
| Period 11 of 2025-26 | 11,681 | 77.7% | 5.1% |
| Period 10 of 2025-26 | 9,441 | 79.5% | 7.5% |
| Period 9 of 2025-26 | 12,012 | 71.5% | 10.7% |
| Period 8 of 2025-26 | 12,080 | 75.8% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tottenham Hale | 150,602 | 90.3% | 3.2% |
| Gospel Oak | 152,525 | 85.8% | 6.5% |
| Earlsfield | 152,922 | 81.2% | 5.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out