Glenrothes with Thornton
GLTScotlandManaged by ScotRail
How this station is performing
Glenrothes with Thornton had 16,219 scheduled stops to Period 7 of 2026-27, about 45 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Glenrothes with Thornton opened on 11 May 1992, 34 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Glenrothes with Thornton is the newest; the oldest, Markinch, opened in 1847.
The nearest stations to Glenrothes with Thornton are Markinch (4.3 km north), Kirkcaldy (5.8 km south), Cameron Bridge (6.8 km north-east), Cardenden (7.7 km west) and Leven (9.4 km east). 5 stations lie within 10 km in all. Of the five, Leven is the most punctual at 83.4% and Kirkcaldy the least at 78.2%, with Glenrothes with Thornton on 79.2%.
Glenrothes with Thornton is named after Glenrothes, a town, home to about 38,510 people, but the station stands 4.3 km from its centre.
Glenrothes with Thornton has slipped a little, from 83.8% within three minutes in the previous 13 periods to 79.2% in the latest 13, a fall of 4.6 percentage points. Cancellations fell to 1.6% of scheduled stops from 2.5%, which is 0.9 percentage points fewer.
Compared with 3 stations of a similar size in Scotland, Glenrothes with Thornton is the least punctual, at 79.2%. All of them are ahead, including Kelvindale (95.6%), Ashfield (94.2%) and Gilshochill (95.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 16,219 | 79.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Glenrothes with Thornton? Delay Repay
These operators call at Glenrothes with Thornton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,429 | 65.8% | 1.0% |
| Period 6 of 2026-27 | 1,219 | 80.1% | 2.2% |
| Period 5 of 2026-27 | 1,221 | 77.6% | 2.2% |
| Period 4 of 2026-27 | 1,218 | 80.0% | 2.3% |
| Period 3 of 2026-27 | 1,217 | 82.5% | 2.1% |
| Period 2 of 2026-27 | 1,216 | 84.2% | 0.3% |
| Period 1 of 2026-27 | 1,398 | 82.3% | 2.0% |
| Period 13 of 2025-26 | 1,338 | 85.2% | 1.0% |
| Period 12 of 2025-26 | 1,216 | 81.3% | 0.7% |
| Period 11 of 2025-26 | 1,390 | 85.0% | 1.4% |
| Period 10 of 2025-26 | 1,037 | 76.8% | 1.0% |
| Period 9 of 2025-26 | 1,160 | 74.8% | 2.5% |
| Period 8 of 2025-26 | 1,160 | 73.0% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kelvindale | 16,898 | 95.6% | 1.2% |
| Ashfield | 16,920 | 94.2% | 1.2% |
| Gilshochill | 16,920 | 95.3% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out