GTR at Gillingham (Kent)
How this operator is doing here
GTR had 26,160 scheduled stops at Gillingham (Kent) in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 81.6% of recorded arrivals came within three minutes and 5.8% of stops were cancelled.
GTR trains at Gillingham (Kent) also serve Chatham (2.2 km west, 84.5% on time, 5.0% cancelled), Rochester (3.1 km west, 80.5% on time, 4.9% cancelled), Strood (Kent) (3.7 km west, 83.8% on time, 4.8% cancelled), Rainham (Kent) (4.8 km south-east, 80.6% on time, 7.2% cancelled), Higham (7.4 km north-west, 84.5% on time, 4.8% cancelled) and Gravesend (14.1 km north-west, 82.4% on time, 4.7% cancelled), which are the stations on its network closest to Gillingham (Kent).
Within 30 km of here, GTR runs best at Bat and Ball, 27.1 km south-west (91.9%), and worst at Dartford, 24.0 km west (78.2%).
The busiest GTR station within 30 km of Gillingham (Kent) is Gravesend, 14.1 km north-west, with about 73 scheduled stops a day.
Of the 2 operators with enough records at Gillingham (Kent), GTR is the most punctual, at 81.6%.
For GTR, Gillingham (Kent) is the 188th best of 307 ranked stations. Its 81.6% here is 1.3 percentage points below the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,075 | 79.4% | 5.3% |
| Period 6 of 2026-27 | 2,050 | 78.6% | 5.7% |
| Period 5 of 2026-27 | 1,624 | 77.4% | 6.2% |
| Period 4 of 2026-27 | 2,012 | 80.3% | 5.2% |
| Period 3 of 2026-27 | 1,686 | 82.0% | 6.0% |
| Period 2 of 2026-27 | 1,961 | 80.9% | 5.8% |
| Period 1 of 2026-27 | 2,388 | 86.4% | 4.6% |
| Period 13 of 2025-26 | 2,256 | 86.0% | 2.5% |
| Period 12 of 2025-26 | 2,005 | 86.9% | 3.3% |
| Period 11 of 2025-26 | 1,957 | 82.6% | 5.9% |
| Period 10 of 2025-26 | 1,981 | 83.4% | 10.5% |
| Period 9 of 2025-26 | 2,105 | 75.7% | 9.3% |
| Period 8 of 2025-26 | 2,060 | 79.0% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gillingham (Kent)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 66,209 | 77.4% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out