Littlehampton
LITSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Littlehampton had 41,898 scheduled stops to Period 7 of 2026-27, about 115 a day. 83.3% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Littlehampton opened on 17 August 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ford is the oldest (1846) and Barnham the newest (1864), with Littlehampton in between.
The nearest stations to Littlehampton are Ford (3.1 km north-west), Angmering (4.2 km east), Arundel (4.2 km north), Barnham (7.0 km west) and Goring-by-Sea (8.0 km east). 8 stations lie within 10 km in all. At 83.3%, Littlehampton is more punctual than every one of them; the best of the five, Barnham, manages 81.6%.
Littlehampton takes its name from a town called Littlehampton, home to about 58,357 people, and the station stands 0.4 km from its centre.
For Littlehampton, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 76.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 89.6%, which is 13.4 percentage points higher. Cancellations peaked at 6.4% of scheduled stops in Period 4 of 2023-24, against 2.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Littlehampton is the most punctual, at 83.3%. The comparison group includes Newbury (77.2%), Eastleigh (71.2%) and Margate (77.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 41,898 | 83.3% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Littlehampton? Delay Repay
These operators call at Littlehampton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,179 | 79.6% | 1.2% |
| Period 6 of 2026-27 | 3,118 | 76.2% | 3.8% |
| Period 5 of 2026-27 | 3,150 | 81.4% | 3.3% |
| Period 4 of 2026-27 | 3,205 | 84.6% | 1.8% |
| Period 3 of 2026-27 | 3,208 | 81.3% | 2.6% |
| Period 2 of 2026-27 | 3,127 | 83.4% | 4.7% |
| Period 1 of 2026-27 | 3,725 | 87.9% | 2.7% |
| Period 13 of 2025-26 | 3,550 | 86.4% | 2.9% |
| Period 12 of 2025-26 | 3,216 | 87.2% | 2.1% |
| Period 11 of 2025-26 | 3,125 | 87.7% | 2.8% |
| Period 10 of 2025-26 | 2,860 | 84.3% | 2.5% |
| Period 9 of 2025-26 | 3,187 | 79.0% | 3.4% |
| Period 8 of 2025-26 | 3,248 | 82.4% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out