Five Ways
FWYWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Five Ways had 49,016 scheduled stops to Period 7 of 2026-27, about 135 a day. 76.9% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Five Ways opened on 1 July 1885 and closed to passengers on 2 October 1944. It reopened on 8 May 1978, 48 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Birmingham Snow Hill is the oldest (1852) and Jewellery Quarter the newest (1995), with Five Ways in between.
The nearest stations to Five Ways are Birmingham New Street (1.2 km north-east), Birmingham Snow Hill (1.7 km north-east), Birmingham Moor Street (1.7 km north-east), Jewellery Quarter (2.0 km north) and Bordesley (2.4 km east). 40 stations lie within 10 km in all. Of the five, Birmingham Moor Street is the most punctual at 87.8% and Birmingham New Street the least at 67.9%, with Five Ways on 76.9%.
Across the whole run of data, the weakest four-week period for Five Ways was Period 9 of 2024-25, at 61.9%, some time before the latest year. The strongest was Period 1 of 2025-26, at 86.5%, and the two are 24.6 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 10 of 2024-25, against 2.5% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Five Ways is the least punctual, at 76.9%. All of them are ahead, including Longbridge (79.2%), Selly Oak (80.6%) and Bournville (80.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 49,015 | 76.9% | 2.5% |
| CrossCountry | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Five Ways? Delay Repay
These operators call at Five Ways and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,796 | 72.8% | 3.1% |
| Period 6 of 2026-27 | 3,796 | 75.1% | 2.5% |
| Period 5 of 2026-27 | 3,800 | 77.1% | 2.6% |
| Period 4 of 2026-27 | 3,564 | 71.8% | 3.5% |
| Period 3 of 2026-27 | 3,488 | 78.7% | 2.2% |
| Period 2 of 2026-27 | 3,624 | 78.0% | 2.3% |
| Period 1 of 2026-27 | 4,373 | 81.0% | 1.3% |
| Period 13 of 2025-26 | 4,175 | 80.7% | 1.4% |
| Period 12 of 2025-26 | 3,800 | 84.4% | 1.3% |
| Period 11 of 2025-26 | 3,615 | 84.0% | 3.8% |
| Period 10 of 2025-26 | 3,457 | 80.5% | 1.6% |
| Period 9 of 2025-26 | 3,728 | 66.4% | 4.8% |
| Period 8 of 2025-26 | 3,800 | 68.5% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Longbridge | 49,016 | 79.2% | 3.1% |
| Selly Oak | 49,016 | 80.6% | 2.6% |
| Bournville | 49,014 | 80.5% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out