Longbridge
LOBWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Longbridge had 49,016 scheduled stops to Period 7 of 2026-27, about 135 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Longbridge opened on 8 May 1978, 48 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Longbridge is the newest; the oldest, Barnt Green, opened in 1844.
The nearest stations to Longbridge are Northfield (1.6 km north-east), Kings Norton (3.8 km north-east), Barnt Green (4.1 km south), Bournville (5.0 km north-east) and Alvechurch (5.7 km south). 16 stations lie within 10 km in all. Of the five, Alvechurch is the most punctual at 85.7% and Kings Norton the least at 77.2%, with Longbridge on 79.2%.
Longbridge is one of 2 stations named after a neighborhood called Longbridge, home to about 25,410 people; this one stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Longbridge was Period 9 of 2024-25, at 63.4%, some time before the latest year. The strongest was Period 1 of 2025-26, at 88.3%, and the two are 24.9 percentage points apart. Cancellations peaked at 7.6% of scheduled stops in Period 10 of 2024-25, against 3.1% over the latest 13 periods.
2 of 3 stations of a similar size in West Midlands are more punctual than Longbridge on 79.2%. The comparison group includes Five Ways (76.9%), Selly Oak (80.6%) and Bournville (80.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 49,016 | 79.2% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Longbridge? Delay Repay
These operators call at Longbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,796 | 74.7% | 3.6% |
| Period 6 of 2026-27 | 3,796 | 78.6% | 2.9% |
| Period 5 of 2026-27 | 3,801 | 79.9% | 2.9% |
| Period 4 of 2026-27 | 3,564 | 75.6% | 4.4% |
| Period 3 of 2026-27 | 3,489 | 80.4% | 2.8% |
| Period 2 of 2026-27 | 3,624 | 79.7% | 2.9% |
| Period 1 of 2026-27 | 4,373 | 82.5% | 2.0% |
| Period 13 of 2025-26 | 4,175 | 83.6% | 2.2% |
| Period 12 of 2025-26 | 3,800 | 85.4% | 2.0% |
| Period 11 of 2025-26 | 3,613 | 86.0% | 4.4% |
| Period 10 of 2025-26 | 3,457 | 82.8% | 1.9% |
| Period 9 of 2025-26 | 3,728 | 68.5% | 5.2% |
| Period 8 of 2025-26 | 3,800 | 70.9% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Five Ways | 49,016 | 76.9% | 2.5% |
| Selly Oak | 49,016 | 80.6% | 2.6% |
| Bournville | 49,014 | 80.5% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out