Selly Oak
SLYWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Selly Oak had 49,016 scheduled stops to Period 7 of 2026-27, about 135 a day. 80.6% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Selly Oak opened on 3 April 1876. It was moved to the site it uses now on 13 April 1885. Among the 5 stations nearest to it with a known opening date, Kings Norton is the oldest (1849) and University (Birmingham) the newest (1978), with Selly Oak in between.
The nearest stations to Selly Oak are University (Birmingham) (1.1 km north), Bournville (1.7 km south), Kings Norton (3.1 km south), Five Ways (3.6 km north-east) and Northfield (4.2 km south-west). 38 stations lie within 10 km in all. Of the five, Northfield is the most punctual at 83.9% and University (Birmingham) the least at 76.4%, with Selly Oak on 80.6%.
Selly Oak takes its name from a suburb called Selly Oak, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Selly Oak was Period 9 of 2024-25, at 66.2%, some time before the latest year. The strongest was Period 1 of 2025-26, at 89.2%, and the two are 23.0 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 10 of 2024-25, against 2.6% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Selly Oak is the most punctual, at 80.6%. The comparison group includes Five Ways (76.9%), Longbridge (79.2%) and Bournville (80.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 49,016 | 80.6% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Selly Oak? Delay Repay
These operators call at Selly Oak and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,798 | 76.7% | 3.1% |
| Period 6 of 2026-27 | 3,796 | 79.2% | 2.5% |
| Period 5 of 2026-27 | 3,800 | 81.2% | 2.6% |
| Period 4 of 2026-27 | 3,564 | 76.3% | 3.6% |
| Period 3 of 2026-27 | 3,488 | 81.9% | 2.2% |
| Period 2 of 2026-27 | 3,624 | 81.5% | 2.3% |
| Period 1 of 2026-27 | 4,373 | 83.9% | 1.3% |
| Period 13 of 2025-26 | 4,175 | 84.1% | 1.5% |
| Period 12 of 2025-26 | 3,800 | 87.4% | 1.4% |
| Period 11 of 2025-26 | 3,613 | 87.2% | 3.8% |
| Period 10 of 2025-26 | 3,457 | 84.0% | 1.6% |
| Period 9 of 2025-26 | 3,728 | 70.7% | 4.9% |
| Period 8 of 2025-26 | 3,800 | 72.7% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Five Ways | 49,016 | 76.9% | 2.5% |
| Longbridge | 49,016 | 79.2% | 3.1% |
| Bournville | 49,014 | 80.5% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out