Ferryside
FYSWalesManaged by TfW Rail
How this station is performing
Ferryside has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,537 scheduled stops, about 34 a day. In those periods 70.3% of stops arrived within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Ferryside opened on 11 October 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ferryside is the oldest; the next oldest, Kidwelly, dates from 1852.
The nearest stations to Ferryside are Kidwelly (5.2 km south-east), Carmarthen (10.4 km north-east), Pembrey and Burry Port (12.5 km south-east), Whitland (17.7 km west) and Llanelli (17.8 km south-east). 1 stations lie within 10 km in all. Of the five, Carmarthen is the most punctual at 74.8% and Whitland the least at 67.8%, with Ferryside on 70.3%.
Ferryside takes its name from a Village called Ferryside, home to about 846 people, and the station stands 0.3 km from its centre.
Ferryside improved sharply over the past year. In the latest 13 periods 70.3% of stops came within three minutes of the timetable, up 5.3 percentage points from 65.0% in the 13 before. Cancellations held steady at 2.4% of scheduled stops, against 2.7% before.
2 of 3 stations of a similar size in Wales are more punctual than Ferryside on 70.3%. The comparison group includes Kidwelly (69.1%), Caldicot (70.8%) and Tir-Phil (88.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 11,915 | 69.6% | 2.3% |
| Great Western Railway | 622 | – | – |
Operators with their own page for this station are linked to it.
Late train at Ferryside? Delay Repay
These operators call at Ferryside and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 915 | 69.7% | 2.8% |
| Period 6 of 2026-27 | 1,014 | 68.3% | 0.8% |
| Period 5 of 2026-27 | 1,003 | 62.7% | 2.9% |
| Period 4 of 2026-27 | 997 | 64.5% | 3.6% |
| Period 3 of 2026-27 | 999 | 68.3% | 3.0% |
| Period 2 of 2026-27 | 966 | 71.2% | 2.4% |
| Period 1 of 2026-27 | 1,123 | 74.2% | 2.7% |
| Period 13 of 2025-26 | 1,061 | 77.6% | 1.3% |
| Period 12 of 2025-26 | 969 | 80.4% | 1.0% |
| Period 11 of 2025-26 | 936 | 82.4% | 1.9% |
| Period 10 of 2025-26 | 867 | – | 2.3% |
| Period 9 of 2025-26 | 945 | – | 3.4% |
| Period 8 of 2025-26 | 742 | 58.5% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out