Transport for Wales at Ferryside
All trains at FerrysideTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 11,915 scheduled stops at Ferryside in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 69.6% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Transport for Wales trains at Ferryside also serve Kidwelly (5.2 km south-east, 68.4% on time, 2.3% cancelled), Carmarthen (10.4 km north-east, 74.0% on time, 2.7% cancelled), Pembrey and Burry Port (12.5 km south-east, 68.6% on time, 2.2% cancelled), Whitland (17.7 km west, 67.8% on time, 3.4% cancelled), Llanelli (17.8 km south-east, 68.6% on time, 2.9% cancelled) and Bynea (21.5 km south-east, 70.0% on time, 5.0% cancelled), which are the stations on its network closest to Ferryside.
Within 30 km of here, Transport for Wales runs best at Llandeilo, 29.3 km north-east (80.7%), and worst at Saundersfoot, 24.5 km west (57.3%).
The busiest Transport for Wales station within 30 km of Ferryside is Carmarthen, 10.4 km north-east, with about 60 scheduled stops a day.
Transport for Wales at Ferryside improved sharply over the past year. In the latest 13 periods 69.6% of stops came within three minutes of the timetable, up 5.6 percentage points from 64.0% in the 13 before. Cancellations held steady at 2.3% of scheduled stops, against 2.5% before.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 869 | 68.9% | 2.3% |
| Period 6 of 2026-27 | 963 | 67.5% | 0.4% |
| Period 5 of 2026-27 | 951 | 61.9% | 2.9% |
| Period 4 of 2026-27 | 945 | 63.4% | 3.6% |
| Period 3 of 2026-27 | 947 | 67.8% | 3.0% |
| Period 2 of 2026-27 | 916 | 70.4% | 2.1% |
| Period 1 of 2026-27 | 1,068 | 73.2% | 2.6% |
| Period 13 of 2025-26 | 1,008 | 77.0% | 1.2% |
| Period 12 of 2025-26 | 926 | 79.7% | 1.0% |
| Period 11 of 2025-26 | 898 | 82.1% | 1.9% |
| Period 10 of 2025-26 | 823 | – | 2.3% |
| Period 9 of 2025-26 | 898 | – | 3.1% |
| Period 8 of 2025-26 | 703 | 57.4% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ferryside
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 622 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out