Bruton
BRUSouth WestManaged by Great Western Railway
How this station is performing
Bruton had 8,515 scheduled stops to Period 7 of 2026-27, about 23 a day. 68.8% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Bruton opened on 1 September 1856, 170 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Frome is the oldest (1850) and Sherborne the newest (1860), with Bruton in between.
The nearest stations to Bruton are Castle Cary (5.4 km west), Templecombe (12.4 km south), Gillingham (Dorset) (15.0 km south-east), Frome (16.0 km north-east) and Sherborne (19.2 km south). 1 stations lie within 10 km in all. Of the five, Frome is the most punctual at 70.7% and Castle Cary the least at 57.2%, with Bruton on 68.8%.
Bruton takes its name from a market town called Bruton, home to about 2,926 people, and the station stands 0.4 km from its centre.
2 operators call at Bruton: Great Western Railway (65.2%, 73% of stops) and South Western Railway (78.9%, 27% of stops). The operator you travel with matters: South Western Railway reaches 78.9% within three minutes while Great Western Railway manages 65.2%, a gap of 13.7 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Bruton on 68.8%. The comparison group includes Feniton (66.7%), Lelant (94.9%) and Whimple (70.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 6,211 | 65.2% | 3.3% |
| South Western Railway | 2,304 | 78.9% | 7.7% |
Operators with their own page for this station are linked to it.
Late train at Bruton? Delay Repay
These operators call at Bruton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 645 | 72.1% | 3.3% |
| Period 6 of 2026-27 | 648 | 66.4% | 3.5% |
| Period 5 of 2026-27 | 670 | 59.9% | 3.6% |
| Period 4 of 2026-27 | 677 | 59.4% | 4.3% |
| Period 3 of 2026-27 | 652 | 69.2% | 7.4% |
| Period 2 of 2026-27 | 655 | 63.5% | 7.9% |
| Period 1 of 2026-27 | 698 | 74.3% | 3.3% |
| Period 13 of 2025-26 | 723 | 78.6% | 2.9% |
| Period 12 of 2025-26 | 657 | 80.6% | 2.6% |
| Period 11 of 2025-26 | 649 | 77.1% | 2.9% |
| Period 10 of 2025-26 | 557 | 71.7% | 5.4% |
| Period 9 of 2025-26 | 643 | 63.3% | 7.3% |
| Period 8 of 2025-26 | 641 | 56.5% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out