Lelant
LELSouth WestManaged by Great Western Railway
How this station is performing
Lelant had 8,245 scheduled stops to Period 7 of 2026-27, about 23 a day. 94.9% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Lelant opened on 1 June 1877, 149 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hayle is the oldest (1852) and Lelant Saltings the newest (1978), with Lelant in between.
The nearest stations to Lelant are Lelant Saltings (0.7 km south-west), Hayle (1.2 km east), St Erth (1.6 km south), Carbis Bay (2.5 km north-west) and St Ives (Cornwall) (4.0 km north-west). 6 stations lie within 10 km in all. Of the five, Lelant Saltings is the most punctual at 97.8% and Hayle the least at 67.9%, with Lelant on 94.9%.
Lelant takes its name from a Village called Lelant, and the station stands 0.2 km from its centre.
In South West, Lelant ranks 5th of 147 ranked stations. Its 94.9% is 20.9 percentage points better than the area median of 74.0%.
Compared with 3 stations of a similar size in South West, Lelant is the most punctual, at 94.9%. The comparison group includes Feniton (66.7%), Whimple (70.2%) and Bruton (68.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 8,245 | 94.9% | 2.0% |
Operators with their own page for this station are linked to it.
Late train at Lelant? Delay Repay
These operators call at Lelant and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 660 | 97.0% | 0.8% |
| Period 6 of 2026-27 | 664 | 95.7% | 1.1% |
| Period 5 of 2026-27 | 664 | 92.5% | 2.3% |
| Period 4 of 2026-27 | 664 | 90.4% | 3.3% |
| Period 3 of 2026-27 | 664 | 95.2% | 0.9% |
| Period 2 of 2026-27 | 662 | 95.4% | 1.1% |
| Period 1 of 2026-27 | 763 | 95.4% | 0.8% |
| Period 13 of 2025-26 | 722 | 95.4% | 1.7% |
| Period 12 of 2025-26 | 660 | 96.0% | 0.6% |
| Period 11 of 2025-26 | 330 | 96.4% | 8.2% |
| Period 10 of 2025-26 | 602 | 93.0% | 4.0% |
| Period 9 of 2025-26 | 530 | 97.8% | 3.6% |
| Period 8 of 2025-26 | 660 | 95.8% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.