South Western Railway at Feniton
All trains at FenitonSouth Western Railway across BritainSouth West
How this operator is doing here
South Western Railway had 7,916 scheduled stops at Feniton in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 67.2% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
South Western Railway trains at Feniton also serve Whimple (5.3 km south-west, 70.2% on time, 2.5% cancelled), Honiton (7.0 km east, 59.6% on time, 2.3% cancelled), Cranbrook (Devon) (10.4 km south-west, 68.7% on time, 2.6% cancelled), Pinhoe (14.1 km south-west, 71.1% on time, 2.6% cancelled), Exeter Central (18.6 km west, 70.4% on time, 3.3% cancelled) and Exeter St David's (19.3 km west, 70.1% on time, 4.2% cancelled), which are the stations on its network closest to Feniton.
Within 30 km of here, South Western Railway runs best at Pinhoe, 14.1 km south-west (71.1%), and worst at Axminster, 19.7 km east (59.1%).
The busiest South Western Railway station within 30 km of Feniton is Honiton, 7.0 km east, with about 31 scheduled stops a day.
Of the 1 operators with enough records at Feniton, South Western Railway is the most punctual, at 67.2%.
South Western Railway at Feniton has slipped a little, from 70.1% within three minutes in the previous 13 periods to 67.2% in the latest 13, a fall of 2.9 percentage points. Cancellations held steady at 2.7% of scheduled stops, against 2.7% before.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 525 | 76.3% | 1.5% |
| Period 6 of 2026-27 | 522 | 74.4% | 0.8% |
| Period 5 of 2026-27 | 590 | 51.8% | 3.6% |
| Period 4 of 2026-27 | 640 | 48.8% | 4.4% |
| Period 3 of 2026-27 | 677 | 62.5% | 2.8% |
| Period 2 of 2026-27 | 657 | 62.3% | 3.3% |
| Period 1 of 2026-27 | 716 | 62.8% | 2.2% |
| Period 13 of 2025-26 | 677 | 71.9% | 2.1% |
| Period 12 of 2025-26 | 615 | 77.9% | 2.4% |
| Period 11 of 2025-26 | 591 | 66.2% | 3.9% |
| Period 10 of 2025-26 | 593 | 70.4% | 3.2% |
| Period 9 of 2025-26 | 570 | 70.2% | 0.7% |
| Period 8 of 2025-26 | 543 | 81.7% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Feniton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 339 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out