Beaulieu Road
BEUSouth EastManaged by South Western Railway
How this station is performing
Beaulieu Road had 6,498 scheduled stops to Period 7 of 2026-27, about 18 a day. 71.2% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Beaulieu Road opened on 1 June 1847 and closed to passengers on 1 March 1860. It reopened on 1 November 1895, 131 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Beaulieu Road is the oldest; the next oldest, Ashurst New Forest, dates from 1847.
The nearest stations to Beaulieu Road are Ashurst New Forest (4.2 km north), Brockenhurst (6.5 km south-west), Totton (7.1 km north), Redbridge (7.6 km north) and Millbrook (Hants) (8.0 km north-east). 6 stations lie within 10 km in all. Of the five, Millbrook (Hants) is the most punctual at 79.1% and Totton the least at 68.7%, with Beaulieu Road on 71.2%.
Beaulieu Road is named after Beaulieu, a Village, home to about 809 people, but the station stands 5.5 km from its centre.
Compared with 3 stations of a similar size in South East, Beaulieu Road is the least punctual, at 71.2%. All of them are ahead, including Appleford (76.1%), Faygate (73.6%) and Tackley (76.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 6,498 | 71.2% | 5.3% |
Operators with their own page for this station are linked to it.
Late train at Beaulieu Road? Delay Repay
These operators call at Beaulieu Road and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 446 | 58.8% | 3.6% |
| Period 6 of 2026-27 | 486 | 71.0% | 0.8% |
| Period 5 of 2026-27 | 493 | 58.5% | 3.0% |
| Period 4 of 2026-27 | 506 | 57.6% | 6.5% |
| Period 3 of 2026-27 | 546 | 74.3% | 8.1% |
| Period 2 of 2026-27 | 502 | 73.8% | 8.0% |
| Period 1 of 2026-27 | 528 | 85.5% | 3.0% |
| Period 13 of 2025-26 | 576 | 83.3% | 5.9% |
| Period 12 of 2025-26 | 450 | 81.0% | 7.6% |
| Period 11 of 2025-26 | 507 | 83.3% | 7.7% |
| Period 10 of 2025-26 | 470 | 76.4% | 3.6% |
| Period 9 of 2025-26 | 508 | 56.8% | 5.7% |
| Period 8 of 2025-26 | 480 | 62.0% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out