ScotRail had 38,108 scheduled stops at Falkirk Grahamston in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 91.2% of recorded arrivals came within three minutes and 0.9% of stops were cancelled.
ScotRail trains at Falkirk Grahamston also serve Falkirk High (1.2 km south, 93.4% on time, 1.2% cancelled), Camelon (2.1 km west, 93.8% on time, 0.9% cancelled), Larbert (3.5 km north-west, 92.7% on time, 0.8% cancelled), Polmont (4.8 km south-east, 92.7% on time, 1.0% cancelled), Linlithgow (12.1 km east, 92.4% on time, 1.0% cancelled) and Alloa (12.9 km north, 95.6% on time, 1.4% cancelled), which are the stations on its network closest to Falkirk Grahamston.
Within 30 km of here, ScotRail runs best at Alloa, 12.9 km north (95.6%), and worst at Bargeddie, 24.6 km south-west (69.7%).
The busiest ScotRail station within 30 km of Falkirk Grahamston is Stirling, 16.0 km north-west, with about 214 scheduled stops a day.
Of the 2 operators with enough records at Falkirk Grahamston, ScotRail is the most punctual, at 91.2%.
For ScotRail, Falkirk Grahamston is the 84th best of 312 ranked stations. Its 91.2% here is 3.3 percentage points above the 87.9% across the whole network.
Over three full railway years ScotRail at Falkirk Grahamston has got worse each time, from 92.4% within three minutes in 2023-24 to 92.0% in 2024-25 and 91.2% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,916 | 91.1% | 0.5% |
| Period 6 of 2026-27 | 2,762 | 91.9% | 1.2% |
| Period 5 of 2026-27 | 2,917 | 92.2% | 0.6% |
| Period 4 of 2026-27 | 3,119 | 90.4% | 1.6% |
| Period 3 of 2026-27 | 2,917 | 92.7% | 1.6% |
| Period 2 of 2026-27 | 2,914 | 93.3% | 1.0% |
| Period 1 of 2026-27 | 3,436 | 92.2% | 0.9% |
| Period 13 of 2025-26 | 3,189 | 92.9% | 0.9% |
| Period 12 of 2025-26 | 2,916 | 93.5% | 0.4% |
| Period 11 of 2025-26 | 3,172 | 88.8% | 0.7% |
| Period 10 of 2025-26 | 2,434 | 91.0% | 0.7% |
| Period 9 of 2025-26 | 2,708 | 88.7% | 0.9% |
| Period 8 of 2025-26 | 2,708 | 86.7% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Falkirk Grahamston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 711 | 50.3% | 0.3% |