LNER at Falkirk Grahamston
How this operator is doing here
LNER had 711 scheduled stops at Falkirk Grahamston in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 50.3% of recorded arrivals came within three minutes and 0.3% of stops were cancelled.
LNER trains at Falkirk Grahamston also serve Stirling (16.0 km north-west, 54.0% on time, 0.3% cancelled), Dunblane (23.3 km north-west, – on time, – cancelled), Inverkeithing (24.5 km east, 55.4% on time, 1.6% cancelled), Gleneagles (30.5 km north, 54.0% on time, 0.3% cancelled), Haymarket (35.8 km east, 51.2% on time, 1.3% cancelled) and Edinburgh (37.4 km east, 72.5% on time, 2.4% cancelled), which are the stations on its network closest to Falkirk Grahamston.
The busiest LNER station within 30 km of Falkirk Grahamston is Inverkeithing, 24.5 km east, with about 7 scheduled stops a day.
Of the 2 operators with enough records at Falkirk Grahamston, LNER is the least punctual, at 50.3%.
LNER cancels fewer trains at Falkirk Grahamston than elsewhere: 0.3% of scheduled stops, against 2.9% across its network and 0.9% for every operator at the station.
LNER at Falkirk Grahamston has slipped sharply. 50.3% of stops came within three minutes of the timetable in the latest 13 periods, 13.5 percentage points worse than the 63.8% recorded in the 13 before. Cancellations fell to 0.3% of scheduled stops from 1.9%, which is 1.6 percentage points fewer.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 56 | 48.2% | 0.0% |
| Period 6 of 2026-27 | 52 | – | – |
| Period 5 of 2026-27 | 55 | – | – |
| Period 4 of 2026-27 | 56 | 35.7% | 0.0% |
| Period 3 of 2026-27 | 56 | 53.6% | 0.0% |
| Period 2 of 2026-27 | 56 | 46.4% | 0.0% |
| Period 1 of 2026-27 | 63 | 45.2% | 1.6% |
| Period 13 of 2025-26 | 56 | 55.4% | 0.0% |
| Period 12 of 2025-26 | 48 | – | – |
| Period 11 of 2025-26 | 53 | – | – |
| Period 10 of 2025-26 | 49 | – | – |
| Period 9 of 2025-26 | 55 | – | – |
| Period 8 of 2025-26 | 56 | 67.9% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Falkirk Grahamston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 38,108 | 91.2% | 0.9% |
| Caledonian Sleeper | 302 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out