Eridge
ERISouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Eridge had 12,627 scheduled stops to Period 7 of 2026-27, about 35 a day. 74.7% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Eridge opened on 3 August 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tunbridge Wells is the oldest (1845) and Ashurst (Kent) the newest (1888), with Eridge in between.
The nearest stations to Eridge are Crowborough (4.8 km south), Ashurst (Kent) (5.5 km north-west), Tunbridge Wells (6.3 km north-east), Frant (6.8 km east) and Wadhurst (8.0 km east). 7 stations lie within 10 km in all. Of the five, Wadhurst is the most punctual at 75.6% and Tunbridge Wells the least at 73.2%, with Eridge on 74.7%.
Eridge has slipped sharply. 74.7% of stops came within three minutes of the timetable in the latest 13 periods, 9.4 percentage points worse than the 84.1% recorded in the 13 before. Cancellations rose to 4.3% of scheduled stops from 2.6%, which is 1.7 percentage points more.
2 of 3 stations of a similar size in South East are more punctual than Eridge on 74.7%. The comparison group includes Millbrook (Hants) (79.1%), Edenbridge Town (69.5%) and Appledore (Kent) (85.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,627 | 74.7% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Eridge? Delay Repay
These operators call at Eridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,008 | 39.9% | 3.1% |
| Period 6 of 2026-27 | 744 | 26.5% | 15.3% |
| Period 5 of 2026-27 | 909 | 65.1% | 10.8% |
| Period 4 of 2026-27 | 1,009 | 78.0% | 5.1% |
| Period 3 of 2026-27 | 952 | 74.9% | 5.0% |
| Period 2 of 2026-27 | 887 | 88.2% | 3.0% |
| Period 1 of 2026-27 | 1,152 | 86.9% | 2.3% |
| Period 13 of 2025-26 | 1,117 | 87.7% | 1.3% |
| Period 12 of 2025-26 | 994 | 79.1% | 2.4% |
| Period 11 of 2025-26 | 983 | 82.8% | 2.0% |
| Period 10 of 2025-26 | 901 | 80.8% | 3.2% |
| Period 9 of 2025-26 | 960 | 78.6% | 4.3% |
| Period 8 of 2025-26 | 1,011 | 81.2% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Millbrook (Hants) | 12,648 | 79.1% | 2.1% |
| Edenbridge Town | 12,564 | 69.5% | 3.3% |
| Appledore (Kent) | 12,536 | 85.4% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out