Millbrook (Hants)
MBKSouth EastManaged by South Western Railway
How this station is performing
Millbrook (Hants) had 12,648 scheduled stops to Period 7 of 2026-27, about 35 a day. 79.1% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Millbrook (Hants) opened on 1 November 1861, 165 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Southampton Central is the oldest (1847) and Bitterne the newest (1866), with Millbrook (Hants) in between.
The nearest stations to Millbrook (Hants) are Southampton Central (1.5 km east), Redbridge (2.7 km west), St Denys (3.4 km east), Totton (3.5 km west) and Bitterne (4.1 km east). 17 stations lie within 10 km in all. At 79.1%, Millbrook (Hants) is more punctual than every one of them; the best of the five, Bitterne, manages 77.5%.
Millbrook (Hants) is named after Millbrook, a suburb, but the station stands 1.2 km from its centre.
Millbrook (Hants) has slipped a little, from 83.6% within three minutes in the previous 13 periods to 79.1% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 2.1% of scheduled stops from 1.4%, which is 0.7 percentage points more.
Compared with 3 stations of a similar size in South East, Millbrook (Hants) is the most punctual, at 79.1%. The comparison group includes Eridge (74.7%), Crowborough (73.3%) and Edenbridge Town (69.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 12,648 | 79.1% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Millbrook (Hants)? Delay Repay
These operators call at Millbrook (Hants) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 918 | 77.0% | 1.5% |
| Period 6 of 2026-27 | 980 | 79.7% | 0.7% |
| Period 5 of 2026-27 | 981 | 68.9% | 0.9% |
| Period 4 of 2026-27 | 981 | 68.4% | 2.9% |
| Period 3 of 2026-27 | 979 | 80.3% | 3.4% |
| Period 2 of 2026-27 | 985 | 81.4% | 3.0% |
| Period 1 of 2026-27 | 1,062 | 86.2% | 0.9% |
| Period 13 of 2025-26 | 1,081 | 87.4% | 1.1% |
| Period 12 of 2025-26 | 858 | 80.3% | 0.7% |
| Period 11 of 2025-26 | 982 | 84.3% | 4.7% |
| Period 10 of 2025-26 | 902 | 83.8% | 3.0% |
| Period 9 of 2025-26 | 985 | 72.4% | 1.9% |
| Period 8 of 2025-26 | 954 | 77.8% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eridge | 12,627 | 74.7% | 4.3% |
| Crowborough | 12,727 | 73.3% | 4.6% |
| Edenbridge Town | 12,564 | 69.5% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out