Appledore (Kent)
APDSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Appledore (Kent) had 12,536 scheduled stops to Period 7 of 2026-27, about 34 a day. 85.4% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Appledore (Kent) opened on 13 February 1851, 175 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Appledore (Kent) is the newest; the oldest, Ashford International, opened in 1842.
The nearest stations to Appledore (Kent) are Ham Street (4.7 km north-east), Rye (Sussex) (10.8 km south-west), Ashford International (12.9 km north), Winchelsea (13.6 km south-west) and Pluckley (14.5 km north). 1 stations lie within 10 km in all. Of the five, Winchelsea is the most punctual at 88.5% and Pluckley the least at 72.8%, with Appledore (Kent) on 85.4%.
Appledore (Kent) is named after Appledore, a Village, home to about 832 people, but the station stands 1.8 km from its centre.
Appledore (Kent) has slipped a little, from 90.2% within three minutes in the previous 13 periods to 85.4% in the latest 13, a fall of 4.8 percentage points. Cancellations fell to 4.9% of scheduled stops from 5.7%, which is 0.8 percentage points fewer.
2 of 3 stations of a similar size in South East are more punctual than Appledore (Kent) on 85.4%. The comparison group includes Ham Street (85.7%), Rye (Sussex) (86.6%) and Edenbridge Town (69.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,536 | 85.4% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Appledore (Kent)? Delay Repay
These operators call at Appledore (Kent) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 976 | 77.8% | 7.7% |
| Period 6 of 2026-27 | 979 | 67.5% | 5.9% |
| Period 5 of 2026-27 | 940 | 75.5% | 6.7% |
| Period 4 of 2026-27 | 946 | 85.4% | 3.1% |
| Period 3 of 2026-27 | 985 | 86.2% | 6.7% |
| Period 2 of 2026-27 | 918 | 85.2% | 6.1% |
| Period 1 of 2026-27 | 1,128 | 91.3% | 3.9% |
| Period 13 of 2025-26 | 985 | 94.0% | 6.0% |
| Period 12 of 2025-26 | 919 | 88.1% | 2.3% |
| Period 11 of 2025-26 | 985 | 91.1% | 5.2% |
| Period 10 of 2025-26 | 892 | 89.9% | 3.3% |
| Period 9 of 2025-26 | 990 | 88.4% | 3.7% |
| Period 8 of 2025-26 | 893 | 88.4% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ham Street | 12,536 | 85.7% | 4.9% |
| Rye (Sussex) | 12,527 | 86.6% | 4.3% |
| Edenbridge Town | 12,564 | 69.5% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out