Bramley (Hampshire)
BMYSouth EastManaged by Great Western Railway
How this station is performing
Bramley (Hampshire) had 25,061 scheduled stops to Period 7 of 2026-27, about 69 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Bramley (Hampshire) opened on 1 May 1895, 131 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bramley (Hampshire) is the newest; the oldest, Basingstoke, opened in 1839.
The nearest stations to Bramley (Hampshire) are Mortimer (5.0 km north), Basingstoke (7.1 km south), Hook (8.9 km south-east), Aldermaston (9.6 km north-west) and Midgham (11.0 km north-west). 4 stations lie within 10 km in all. Of the five, Hook is the most punctual at 87.8% and Basingstoke the least at 73.1%, with Bramley (Hampshire) on 86.5%.
Bramley (Hampshire) is named after Bramley, a Village, home to about 5,728 people, but the station stands 0.1 km from its centre.
For Bramley (Hampshire), the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 80.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 95.5%, which is 14.6 percentage points higher. Cancellations peaked at 8.7% of scheduled stops in Period 4 of 2025-26, against 3.6% over the latest 13 periods.
1 of 3 stations of a similar size in South East are more punctual than Bramley (Hampshire) on 86.5%. The comparison group includes Mortimer (86.2%), Reading Green Park (86.0%) and Epsom Downs (92.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 25,059 | 86.5% | 3.6% |
| CrossCountry | 2 | – | – |
Operators with their own page for this station are linked to it.
Late train at Bramley (Hampshire)? Delay Repay
These operators call at Bramley (Hampshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,891 | 84.4% | 2.5% |
| Period 6 of 2026-27 | 1,920 | 80.9% | 3.0% |
| Period 5 of 2026-27 | 1,891 | 81.0% | 4.2% |
| Period 4 of 2026-27 | 1,867 | 82.5% | 4.3% |
| Period 3 of 2026-27 | 1,913 | 85.2% | 6.8% |
| Period 2 of 2026-27 | 1,891 | 86.6% | 4.0% |
| Period 1 of 2026-27 | 2,192 | 90.4% | 2.0% |
| Period 13 of 2025-26 | 2,070 | 92.2% | 2.5% |
| Period 12 of 2025-26 | 1,920 | 92.0% | 3.1% |
| Period 11 of 2025-26 | 1,920 | 91.0% | 2.0% |
| Period 10 of 2025-26 | 1,736 | 89.0% | 4.3% |
| Period 9 of 2025-26 | 1,925 | 83.0% | 5.9% |
| Period 8 of 2025-26 | 1,925 | 84.8% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mortimer | 25,059 | 86.2% | 3.7% |
| Reading Green Park | 25,059 | 86.0% | 3.7% |
| Epsom Downs | 25,097 | 92.6% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out