Beckenham Hill had 33,127 scheduled stops to Period 7 of 2026-27, about 91 a day. 90.6% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Beckenham Hill opened on 1 July 1892, 134 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Beckenham Hill is the newest; the oldest, Lower Sydenham, opened in 1857.
The nearest stations to Beckenham Hill are Bellingham (0.9 km north), Lower Sydenham (1.2 km west), Ravensbourne (1.3 km south-east), New Beckenham (1.6 km south-west) and Beckenham Junction (1.7 km south-west). 97 stations lie within 10 km in all. Of the five, Lower Sydenham is the most punctual at 93.7% and Beckenham Junction the least at 88.4%, with Beckenham Hill on 90.6%.
Beckenham Hill is named after Beckenham, an area of London, home to about 46,844 people, but the station stands 1.9 km from its centre.
Across the whole run of data, the weakest four-week period for Beckenham Hill was Period 9 of 2024-25, at 84.2%, some time before the latest year. The strongest was Period 1 of 2026-27, at 95.0%, and the two are 10.8 percentage points apart. Cancellations peaked at 8.2% of scheduled stops in Period 10 of 2024-25, against 4.1% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Beckenham Hill on 90.6%. The comparison group includes Ravensbourne (91.3%), Barnes Bridge (87.6%) and Chiswick (87.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 33,127 | 90.6% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Beckenham Hill? Delay Repay
These operators call at Beckenham Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,561 | 88.3% | 2.5% |
| Period 6 of 2026-27 | 2,568 | 87.4% | 4.8% |
| Period 5 of 2026-27 | 2,624 | 89.7% | 3.8% |
| Period 4 of 2026-27 | 2,620 | 90.4% | 3.9% |
| Period 3 of 2026-27 | 2,375 | 90.9% | 5.5% |
| Period 2 of 2026-27 | 2,311 | 93.2% | 6.8% |
| Period 1 of 2026-27 | 2,877 | 95.0% | 1.3% |
| Period 13 of 2025-26 | 2,791 | 93.3% | 3.4% |
| Period 12 of 2025-26 | 2,560 | 92.4% | 2.8% |
| Period 11 of 2025-26 | 2,596 | 91.8% | 3.1% |
| Period 10 of 2025-26 | 2,130 | 91.3% | 5.6% |
| Period 9 of 2025-26 | 2,628 | 86.1% | 6.5% |
| Period 8 of 2025-26 | 2,486 | 87.8% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ravensbourne | 33,123 | 91.3% | 4.0% |
| Barnes Bridge | 33,493 | 87.6% | 3.5% |
| Chiswick | 33,494 | 87.6% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out