Ravensbourne
RVBLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Ravensbourne had 33,123 scheduled stops to Period 7 of 2026-27, about 91 a day. 91.3% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Ravensbourne opened on 1 July 1892, 134 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ravensbourne is the newest; the oldest, Beckenham Junction, opened in 1857.
The nearest stations to Ravensbourne are Shortlands (1.2 km south-east), Beckenham Hill (1.3 km north-west), Beckenham Junction (1.3 km west), Bromley North (1.8 km east) and New Beckenham (2.0 km west). 87 stations lie within 10 km in all. Of the five, Bromley North is the most punctual at 99.2% and Shortlands the least at 86.9%, with Ravensbourne on 91.3%.
Across the whole run of data, the weakest four-week period for Ravensbourne was Period 9 of 2024-25, at 84.3%, some time before the latest year. The strongest was Period 1 of 2026-27, at 95.3%, and the two are 11.0 percentage points apart. Cancellations peaked at 8.2% of scheduled stops in Period 10 of 2024-25, against 4.0% over the latest 13 periods.
GTR is the only operator serving Ravensbourne. Here it manages 91.3% within three minutes, 8.4 percentage points better than its 82.9% across its whole network.
Compared with 3 stations of a similar size in London, Ravensbourne is the most punctual, at 91.3%. The comparison group includes Beckenham Hill (90.6%), Catford (90.8%) and Barnes Bridge (87.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 33,123 | 91.3% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Ravensbourne? Delay Repay
These operators call at Ravensbourne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,561 | 88.9% | 2.5% |
| Period 6 of 2026-27 | 2,568 | 87.8% | 4.8% |
| Period 5 of 2026-27 | 2,623 | 90.8% | 3.7% |
| Period 4 of 2026-27 | 2,620 | 91.4% | 3.9% |
| Period 3 of 2026-27 | 2,375 | 91.7% | 5.5% |
| Period 2 of 2026-27 | 2,311 | 93.0% | 6.7% |
| Period 1 of 2026-27 | 2,877 | 95.3% | 1.3% |
| Period 13 of 2025-26 | 2,788 | 93.8% | 3.3% |
| Period 12 of 2025-26 | 2,560 | 93.4% | 2.8% |
| Period 11 of 2025-26 | 2,596 | 92.5% | 3.1% |
| Period 10 of 2025-26 | 2,130 | 92.1% | 5.6% |
| Period 9 of 2025-26 | 2,628 | 87.0% | 6.5% |
| Period 8 of 2025-26 | 2,486 | 88.7% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Beckenham Hill | 33,127 | 90.6% | 4.1% |
| Catford | 32,761 | 90.8% | 4.1% |
| Barnes Bridge | 33,493 | 87.6% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out