Southeastern at Eltham
How this operator is doing here
Southeastern had 66,482 scheduled stops at Eltham in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 83.4% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Southeastern trains at Eltham also serve Mottingham (1.7 km south, 89.1% on time, 1.5% cancelled), Kidbrooke (1.8 km north-west, 85.1% on time, 2.1% cancelled), Falconwood (1.9 km east, 86.5% on time, 2.0% cancelled), New Eltham (2.3 km south-east, 86.9% on time, 1.4% cancelled), Lee (London) (2.7 km west, 87.6% on time, 1.4% cancelled) and Blackheath (3.2 km west, 87.6% on time, 1.8% cancelled), which are the stations on its network closest to Eltham.
Within 30 km of here, Southeastern runs best at Sundridge Park, 5.1 km south-west (99.4%), and worst at Hildenborough, 29.4 km south-east (70.3%).
The busiest Southeastern station within 30 km of Eltham is London Bridge, 11.0 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Eltham, Southeastern is the least punctual, at 83.4%.
For Southeastern, Eltham is the 82nd best of 173 ranked stations. Its 83.4% here is 0.8 percentage points below the 84.2% across the whole network.
Southeastern at Eltham has not moved in one direction over three full railway years: 88.4% within three minutes in 2023-24, 83.5% in 2024-25 and 84.3% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,984 | 83.2% | 1.5% |
| Period 6 of 2026-27 | 5,148 | 81.7% | 1.2% |
| Period 5 of 2026-27 | 4,708 | 82.4% | 2.7% |
| Period 4 of 2026-27 | 5,286 | 85.9% | 1.5% |
| Period 3 of 2026-27 | 5,377 | 81.5% | 3.1% |
| Period 2 of 2026-27 | 4,987 | 82.4% | 5.5% |
| Period 1 of 2026-27 | 6,065 | 86.6% | 1.9% |
| Period 13 of 2025-26 | 5,206 | 84.4% | 1.3% |
| Period 12 of 2025-26 | 5,554 | 84.5% | 1.6% |
| Period 11 of 2025-26 | 4,853 | 83.5% | 1.2% |
| Period 10 of 2025-26 | 4,110 | 85.0% | 1.6% |
| Period 9 of 2025-26 | 5,251 | 81.6% | 1.3% |
| Period 8 of 2025-26 | 4,953 | 81.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Eltham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 388 | 90.0% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out