Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Eltham

All trains at ElthamGTR across BritainLondon

On time, last 13 periods90.0%Whole station: 83.5%
Cancelled1.3%Whole station: 2.0%
Scheduled stops388Of 66,870 at the station

How this operator is doing here

GTR had 388 scheduled stops at Eltham in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 90.0% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.

GTR trains at Eltham also serve Blackheath (3.2 km west, 91.6% on time, 1.3% cancelled), Charlton (3.8 km north-west, 84.1% on time, 6.5% cancelled), Westcombe Park (3.9 km north-west, 82.7% on time, 6.7% cancelled), Woolwich Arsenal (4.0 km north, 82.9% on time, 6.5% cancelled), Plumstead (4.4 km north-east, 85.5% on time, 6.3% cancelled) and Maze Hill (4.6 km north-west, 82.5% on time, 6.7% cancelled), which are the stations on its network closest to Eltham.

Within 30 km of here, GTR runs best at Beckenham Junction, 7.3 km south-west (98.1%), and worst at Kenley, 18.0 km south-west (66.9%).

The busiest GTR station within 30 km of Eltham is East Croydon, 13.5 km south-west, with about 813 scheduled stops a day.

Of the 2 operators with enough records at Eltham, GTR is the most punctual, at 90.0%.

GTR cancels fewer trains at Eltham than elsewhere: 1.3% of scheduled stops, against 4.7% across its network and 2.0% for every operator at the station.

Alongside GTR, the other operators at Eltham are Southeastern (83.4%, 99% of stops), so passengers here can compare several services.

Period by period

80%90%100%2023-242024-252025-262026-27Period 2 of 2023-24: 87.3%Period 5 of 2023-24: 94.7%Period 11 of 2023-24: 90.2%Period 12 of 2023-24: 92.1%Period 13 of 2023-24: 100.0%Period 5 of 2024-25: 90.3%Period 9 of 2024-25: 90.3%Period 2 of 2025-26: 98.3%Period 5 of 2025-26: 98.4%Period 9 of 2025-26: 96.8%Period 11 of 2025-26: 96.7%Period 3 of 2026-27: 87.8%Period 5 of 2026-27: 83.9%
This pageGreat Britain
0%5%10%15%Period 2 of 2023-24: 5.2%Period 5 of 2023-24: 8.1%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 12.5%Period 13 of 2023-24: 5.4%Period 5 of 2024-25: 0.0%Period 9 of 2024-25: 0.0%Period 2 of 2025-26: 3.2%Period 5 of 2025-26: 0.0%Period 9 of 2025-26: 0.0%Period 11 of 2025-26: 0.0%Period 3 of 2026-27: 2.5%Period 5 of 2026-27: 0.0%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

Other operators at Eltham

OperatorScheduled stopsWithin 3 minCancelled
Southeastern66,48283.4%2.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out