Kidbrooke
KDBLondonManaged by Southeastern
How this station is performing
Kidbrooke had 66,468 scheduled stops to Period 7 of 2026-27, about 183 a day. 85.1% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Kidbrooke opened on 1 May 1895, 131 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kidbrooke is the newest; the oldest, Blackheath, opened in 1849.
The nearest stations to Kidbrooke are Blackheath (1.4 km west), Lee (London) (1.7 km south-west), Eltham (1.8 km south-east), Hither Green (2.3 km south-west) and Westcombe Park (2.6 km north). 105 stations lie within 10 km in all. Of the five, Westcombe Park is the most punctual at 88.2% and Eltham the least at 83.5%, with Kidbrooke on 85.1%.
Kidbrooke is one of 2 stations named after an area of London called Kidbrooke, home to about 14,300 people; this one stands 1.1 km from its centre.
Across the whole run of data, the weakest four-week period for Kidbrooke was Period 9 of 2024-25, at 71.4%, some time before the latest year. The strongest was Period 1 of 2023-24, at 91.9%, and the two are 20.5 percentage points apart. Cancellations peaked at 5.5% of scheduled stops in Period 2 of 2026-27, against 2.1% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Kidbrooke on 85.1%. The comparison group includes Falconwood (86.5%), Welling (86.0%) and Bexleyheath (84.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 66,468 | 85.1% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Kidbrooke? Delay Repay
These operators call at Kidbrooke and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,984 | 85.4% | 1.5% |
| Period 6 of 2026-27 | 5,148 | 83.1% | 1.2% |
| Period 5 of 2026-27 | 4,708 | 83.9% | 2.7% |
| Period 4 of 2026-27 | 5,286 | 84.8% | 1.5% |
| Period 3 of 2026-27 | 5,373 | 82.9% | 3.7% |
| Period 2 of 2026-27 | 4,986 | 84.0% | 5.5% |
| Period 1 of 2026-27 | 6,059 | 88.6% | 1.9% |
| Period 13 of 2025-26 | 5,206 | 86.3% | 1.3% |
| Period 12 of 2025-26 | 5,554 | 86.5% | 1.6% |
| Period 11 of 2025-26 | 4,853 | 86.0% | 1.3% |
| Period 10 of 2025-26 | 4,107 | 86.8% | 1.6% |
| Period 9 of 2025-26 | 5,251 | 83.9% | 1.3% |
| Period 8 of 2025-26 | 4,953 | 83.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Falconwood | 66,469 | 86.5% | 2.0% |
| Welling | 66,467 | 86.0% | 2.0% |
| Bexleyheath | 66,868 | 84.1% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out