GTR had 742 scheduled stops at Eastleigh in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 58.4% of recorded arrivals came within three minutes and 7.6% of stops were cancelled.
GTR trains at Eastleigh also serve Southampton Airport Parkway (2.2 km south-west, 66.7% on time, 7.5% cancelled), St Denys (5.8 km south-west, – on time, – cancelled), Woolston (7.9 km south, 84.5% on time, 7.6% cancelled), Sholing (8.1 km south, – on time, – cancelled), Southampton Central (8.1 km south-west, 84.3% on time, 6.9% cancelled) and Netley (10.4 km south, – on time, – cancelled), which are the stations on its network closest to Eastleigh.
Within 30 km of here, GTR runs best at Woolston, 7.9 km south (84.5%), and worst at Fratton, 27.3 km south-east (73.2%).
The busiest GTR station within 30 km of Eastleigh is Havant, 28.8 km south-east, with about 159 scheduled stops a day.
GTR at Eastleigh has slipped sharply. 58.4% of stops came within three minutes of the timetable in the latest 13 periods, 6.6 percentage points worse than the 65.0% recorded in the 13 before. Cancellations fell to 7.6% of scheduled stops from 9.9%, which is 2.3 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 57 | 65.3% | 14.0% |
| Period 6 of 2026-27 | 57 | 50.0% | 5.3% |
| Period 5 of 2026-27 | 56 | 40.4% | 7.1% |
| Period 4 of 2026-27 | 60 | 46.4% | 6.7% |
| Period 3 of 2026-27 | 55 | – | – |
| Period 2 of 2026-27 | 55 | – | – |
| Period 1 of 2026-27 | 63 | 69.5% | 4.8% |
| Period 13 of 2025-26 | 67 | 61.3% | 7.5% |
| Period 12 of 2025-26 | 61 | 60.7% | 8.2% |
| Period 11 of 2025-26 | 60 | 72.2% | 10.0% |
| Period 10 of 2025-26 | 30 | – | – |
| Period 9 of 2025-26 | 61 | 57.1% | 8.2% |
| Period 8 of 2025-26 | 60 | 59.6% | 5.0% |
Other operators at Eastleigh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 40,298 | 71.6% | 2.9% |
| Great Western Railway | 508 | 59.5% | 3.1% |
| CrossCountry | 123 | 77.6% | 9.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out