CrossCountry at Eastleigh
All trains at EastleighCrossCountry across BritainSouth East
How this operator is doing here
CrossCountry had 123 scheduled stops at Eastleigh in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 77.6% of recorded arrivals came within three minutes and 9.7% of stops were cancelled.
CrossCountry trains at Eastleigh also serve Southampton Airport Parkway (2.2 km south-west, 60.9% on time, 4.2% cancelled), Southampton Central (8.1 km south-west, 60.2% on time, 5.8% cancelled), Totton (10.9 km south-west, – on time, – cancelled), Winchester (11.2 km north, 58.6% on time, 4.1% cancelled), Brockenhurst (23.0 km south-west, 62.3% on time, 9.3% cancelled) and Overton (32.4 km north, – on time, – cancelled), which are the stations on its network closest to Eastleigh.
Within 30 km of here, CrossCountry runs best at Brockenhurst, 23.0 km south-west (62.3%), and worst at Winchester, 11.2 km north (58.6%).
The busiest CrossCountry station within 30 km of Eastleigh is Southampton Central, 8.1 km south-west, with about 32 scheduled stops a day.
Of the 4 operators with enough records at Eastleigh, CrossCountry is the most punctual, at 77.6%.
CrossCountry cancels more at Eastleigh than elsewhere: 9.7% of scheduled stops, against 5.9% across its network and 3.1% for every operator at the station.
Alongside CrossCountry, the other operators at Eastleigh are South Western Railway (71.6%, 97% of stops), GTR (58.4%, 2% of stops) and Great Western Railway (59.5%, 1% of stops), so passengers here can compare several services.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 0 | – | – |
| Period 6 of 2026-27 | 0 | – | – |
| Period 5 of 2026-27 | 0 | – | – |
| Period 4 of 2026-27 | 1 | – | – |
| Period 3 of 2026-27 | 0 | – | – |
| Period 2 of 2026-27 | 0 | – | – |
| Period 1 of 2026-27 | 57 | 78.9% | 0.0% |
| Period 13 of 2025-26 | 1 | – | – |
| Period 12 of 2025-26 | 57 | 76.1% | 19.3% |
| Period 11 of 2025-26 | 2 | – | – |
| Period 10 of 2025-26 | 5 | – | – |
| Period 9 of 2025-26 | 0 | – | – |
| Period 8 of 2025-26 | 0 | – | – |
Other operators at Eastleigh
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 40,298 | 71.6% | 2.9% |
| GTR | 742 | 58.4% | 7.6% |
| Great Western Railway | 508 | 59.5% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out