Eastleigh
ESLSouth EastManaged by South Western Railway
How this station is performing
Eastleigh had 41,671 scheduled stops to Period 7 of 2026-27, about 114 a day. 71.2% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Eastleigh opened on 10 June 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Eastleigh is the oldest; the next oldest, St Denys, dates from 1861.
The nearest stations to Eastleigh are Southampton Airport Parkway (2.2 km south-west), Chandlers Ford (2.9 km north-west), Swaythling (3.5 km south-west), Hedge End (5.6 km south-east) and St Denys (5.8 km south-west). 14 stations lie within 10 km in all. Of the five, Chandlers Ford is the most punctual at 76.1% and Southampton Airport Parkway the least at 67.0%, with Eastleigh on 71.2%.
Eastleigh is one of 2 stations named after a town called Eastleigh, home to about 78,716 people; this one stands 0.2 km from its centre.
4 operators call at Eastleigh: South Western Railway (71.6%, 97% of stops), GTR (58.4%, 2% of stops), Great Western Railway (59.5%, 1% of stops) and CrossCountry (77.6%, 0% of stops). The operator you travel with matters: CrossCountry reaches 77.6% within three minutes while GTR manages 58.4%, a gap of 19.2 percentage points.
Compared with 3 stations of a similar size in South East, Eastleigh is the least punctual, at 71.2%. All of them are ahead, including Littlehampton (83.3%), Margate (77.1%) and Newbury (77.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 40,298 | 71.6% | 2.9% |
| GTR | 742 | 58.4% | 7.6% |
| Great Western Railway | 508 | 59.5% | 3.1% |
| CrossCountry | 123 | 77.6% | 9.7% |
Operators with their own page for this station are linked to it.
Late train at Eastleigh? Delay Repay
These operators call at Eastleigh and publish Delay Repay rules.
- South Western Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- GTR: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- Great Western Railway: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,083 | 65.8% | 2.1% |
| Period 6 of 2026-27 | 3,239 | 69.0% | 1.2% |
| Period 5 of 2026-27 | 3,262 | 64.5% | 2.9% |
| Period 4 of 2026-27 | 3,248 | 64.1% | 3.7% |
| Period 3 of 2026-27 | 3,213 | 74.1% | 4.3% |
| Period 2 of 2026-27 | 3,169 | 66.9% | 4.6% |
| Period 1 of 2026-27 | 3,355 | 78.3% | 2.4% |
| Period 13 of 2025-26 | 3,346 | 83.1% | 1.9% |
| Period 12 of 2025-26 | 3,090 | 77.6% | 4.1% |
| Period 11 of 2025-26 | 3,283 | 78.2% | 4.3% |
| Period 10 of 2025-26 | 2,871 | 75.2% | 3.1% |
| Period 9 of 2025-26 | 3,257 | 62.5% | 2.6% |
| Period 8 of 2025-26 | 3,255 | 65.8% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Littlehampton | 41,898 | 83.3% | 2.8% |
| Margate | 41,377 | 77.1% | 1.6% |
| Newbury | 42,121 | 77.2% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out