Dunkeld and Birnam
DKDScotlandManaged by ScotRail
How this station is performing
Dunkeld and Birnam had 7,405 scheduled stops to Period 7 of 2026-27, about 20 a day. 66.3% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Dunkeld and Birnam opened on 7 April 1856, 170 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Invergowrie is the oldest (1847) and Blair Atholl the newest (1863), with Dunkeld and Birnam in between.
Dunkeld and Birnam is remote: its nearest neighbours are Pitlochry (18.9 km north-west), Perth (20.2 km south-east), Blair Atholl (28.6 km north-west), Gleneagles (32.7 km south) and Invergowrie (33.8 km east). Of the five, Perth is the most punctual at 82.7% and Blair Atholl the least at 54.5%, with Dunkeld and Birnam on 66.3%.
Dunkeld and Birnam is named after Dunkeld, a town, but the station stands 1.1 km from its centre.
For Dunkeld and Birnam, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 49.6% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 81.5%, which is 31.9 percentage points higher. Cancellations peaked at 7.1% of scheduled stops in Period 9 of 2024-25, against 1.3% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Dunkeld and Birnam is the least punctual, at 66.3%. All of them are ahead, including Keith (75.0%), Huntly (74.2%) and Insch (76.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 6,738 | 67.6% | 1.2% |
| Caledonian Sleeper | 618 | – | – |
| LNER | 49 | – | – |
Operators with their own page for this station are linked to it.
Late train at Dunkeld and Birnam? Delay Repay
These operators call at Dunkeld and Birnam and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 572 | 56.7% | 1.2% |
| Period 6 of 2026-27 | 572 | 68.8% | 0.7% |
| Period 5 of 2026-27 | 572 | 68.4% | 3.7% |
| Period 4 of 2026-27 | 572 | 69.6% | 0.9% |
| Period 3 of 2026-27 | 569 | 72.1% | 0.2% |
| Period 2 of 2026-27 | 572 | 71.6% | 0.9% |
| Period 1 of 2026-27 | 657 | 71.7% | 1.8% |
| Period 13 of 2025-26 | 629 | 75.3% | 1.0% |
| Period 12 of 2025-26 | 570 | 71.3% | 0.5% |
| Period 11 of 2025-26 | 565 | 59.2% | 3.4% |
| Period 10 of 2025-26 | 491 | 61.9% | 0.2% |
| Period 9 of 2025-26 | 570 | 60.7% | 0.9% |
| Period 8 of 2025-26 | 494 | 49.6% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out