Dunfermline Queen Margaret had 23,991 scheduled stops to Period 7 of 2026-27, about 66 a day. 86.1% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Dunfermline Queen Margaret opened on 26 January 2000, 26 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dunfermline Queen Margaret is the newest; the oldest, Dunfermline City, opened in 1877.
The nearest stations to Dunfermline Queen Margaret are Dunfermline City (2.3 km south-west), Rosyth (3.9 km south), Inverkeithing (5.3 km south), Dalgety Bay (5.4 km south-east) and Cowdenbeath (6.0 km north-east). 8 stations lie within 10 km in all. Of the five, Dunfermline City is the most punctual at 87.2% and Dalgety Bay the least at 79.2%, with Dunfermline Queen Margaret on 86.1%.
Dunfermline Queen Margaret is named after Dunfermline, a city, home to about 53,100 people, but the station stands 2.7 km from its centre.
For Dunfermline Queen Margaret, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 75.4% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2024-25, at 93.5%, which is 18.1 percentage points higher. Cancellations peaked at 10.8% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Dunfermline Queen Margaret is the most punctual, at 86.1%. The comparison group includes Cowdenbeath (83.3%), Rosyth (85.7%) and Burntisland (79.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,991 | 86.1% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Dunfermline Queen Margaret? Delay Repay
These operators call at Dunfermline Queen Margaret and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,852 | 75.4% | 1.1% |
| Period 6 of 2026-27 | 1,839 | 86.2% | 2.2% |
| Period 5 of 2026-27 | 1,841 | 82.7% | 1.8% |
| Period 4 of 2026-27 | 1,838 | 84.4% | 1.6% |
| Period 3 of 2026-27 | 1,837 | 88.1% | 2.0% |
| Period 2 of 2026-27 | 1,836 | 89.7% | 1.1% |
| Period 1 of 2026-27 | 2,126 | 88.6% | 1.8% |
| Period 13 of 2025-26 | 2,005 | 90.7% | 2.0% |
| Period 12 of 2025-26 | 1,836 | 89.7% | 1.2% |
| Period 11 of 2025-26 | 1,822 | 89.5% | 1.4% |
| Period 10 of 2025-26 | 1,561 | 85.4% | 1.1% |
| Period 9 of 2025-26 | 1,800 | 83.6% | 2.6% |
| Period 8 of 2025-26 | 1,798 | 84.8% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cowdenbeath | 24,027 | 83.3% | 1.6% |
| Rosyth | 24,027 | 85.7% | 1.6% |
| Burntisland | 23,955 | 79.0% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out