Dunfermline City
DFEScotlandManaged by ScotRail
How this station is performing
Dunfermline City had 24,241 scheduled stops to Period 7 of 2026-27, about 67 a day. 87.2% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Dunfermline City opened on 1 November 1877, 149 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dunfermline City is the oldest; the next oldest, Inverkeithing, dates from 1877.
The nearest stations to Dunfermline City are Dunfermline Queen Margaret (2.3 km north-east), Rosyth (3.0 km south-east), Inverkeithing (5.1 km south-east), Dalgety Bay (6.0 km south-east) and North Queensferry (7.2 km south-east). 7 stations lie within 10 km in all. At 87.2%, Dunfermline City is more punctual than every one of them; the best of the five, Dunfermline Queen Margaret, manages 86.1%.
Dunfermline City is named after Dunfermline, a city, home to about 53,100 people, but the station stands 0.7 km from its centre.
For Dunfermline City, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 76.6% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2024-25, at 94.5%, which is 17.9 percentage points higher. Cancellations peaked at 10.7% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Dunfermline City is the least punctual, at 87.2%. All of them are ahead, including Kings Park (94.1%), Burnside (South Lanarkshire) (94.0%) and Croftfoot (94.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,241 | 87.2% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Dunfermline City? Delay Repay
These operators call at Dunfermline City and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,872 | 76.6% | 1.1% |
| Period 6 of 2026-27 | 1,859 | 87.0% | 2.2% |
| Period 5 of 2026-27 | 1,861 | 84.1% | 1.9% |
| Period 4 of 2026-27 | 1,858 | 86.0% | 1.6% |
| Period 3 of 2026-27 | 1,857 | 89.6% | 1.9% |
| Period 2 of 2026-27 | 1,856 | 91.1% | 1.1% |
| Period 1 of 2026-27 | 2,149 | 89.6% | 1.9% |
| Period 13 of 2025-26 | 2,027 | 92.0% | 2.0% |
| Period 12 of 2025-26 | 1,856 | 90.6% | 1.2% |
| Period 11 of 2025-26 | 1,842 | 89.7% | 1.4% |
| Period 10 of 2025-26 | 1,574 | 86.6% | 1.1% |
| Period 9 of 2025-26 | 1,816 | 84.4% | 2.6% |
| Period 8 of 2025-26 | 1,814 | 85.5% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kings Park | 24,243 | 94.1% | 1.4% |
| Burnside (South Lanarkshire) | 24,244 | 94.0% | 1.7% |
| Croftfoot | 24,244 | 94.3% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out