Dumfries
DMFScotlandManaged by ScotRail
How this station is performing
Dumfries had 11,765 scheduled stops to Period 7 of 2026-27, about 32 a day. 90.4% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Dumfries opened on 23 August 1848. It was moved to the site it uses now on 13 September 1859. Among the 5 stations nearest to it with a known opening date, Aspatria is the oldest (1841) and Sanquhar the newest (1850), with Dumfries in between.
Dumfries is remote: its nearest neighbours are Lockerbie (16.9 km east), Annan (23.9 km south-east), Gretna Green (35.2 km east), Sanquhar (38.9 km north-west) and Aspatria (39.0 km south-east). Of the five, Aspatria is the most punctual at 94.6% and Lockerbie the least at 56.2%, with Dumfries on 90.4%.
Dumfries takes its name from a town called Dumfries, home to about 33,440 people, and the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Dumfries was Period 7 of 2023-24, at 81.9%, some time before the latest year. The strongest was Period 6 of 2024-25, at 95.1%, and the two are 13.2 percentage points apart.
Compared with 3 stations of a similar size in Scotland, Dumfries is the most punctual, at 90.4%. The comparison group includes Elgin (83.1%), Forres (84.6%) and Inverness Airport (85.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 11,765 | 90.4% | 0.9% |
Operators with their own page for this station are linked to it.
Late train at Dumfries? Delay Repay
These operators call at Dumfries and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 920 | 91.2% | 0.8% |
| Period 6 of 2026-27 | 829 | 92.9% | 1.1% |
| Period 5 of 2026-27 | 920 | 91.4% | 0.3% |
| Period 4 of 2026-27 | 906 | 88.2% | 1.0% |
| Period 3 of 2026-27 | 920 | 90.6% | 1.6% |
| Period 2 of 2026-27 | 920 | 90.5% | 0.1% |
| Period 1 of 2026-27 | 1,058 | 91.3% | 0.2% |
| Period 13 of 2025-26 | 919 | 92.9% | 0.8% |
| Period 12 of 2025-26 | 920 | 92.9% | 0.5% |
| Period 11 of 2025-26 | 876 | 91.9% | 0.8% |
| Period 10 of 2025-26 | 743 | 82.8% | 2.4% |
| Period 9 of 2025-26 | 920 | 87.7% | 1.3% |
| Period 8 of 2025-26 | 914 | 89.9% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elgin | 11,543 | 83.1% | 2.4% |
| Forres | 11,543 | 84.6% | 2.4% |
| Inverness Airport | 11,543 | 85.5% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out