Forres
FORScotlandManaged by ScotRail
How this station is performing
Forres had 11,543 scheduled stops to Period 7 of 2026-27, about 32 a day. 84.6% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Forres opened on 25 March 1858. It was moved to the site it uses now on 17 October 2017. Among the 5 stations nearest to it with a known opening date, Elgin is the oldest (1852) and Inverness Airport the newest (2023), with Forres in between.
Forres is remote: its nearest neighbours are Nairn (15.1 km west), Elgin (19.0 km east), Inverness Airport (27.1 km west), Fearn (28.8 km north-west) and Invergordon (33.8 km west). Of the five, Inverness Airport is the most punctual at 85.5% and Fearn the least at 82.8%, with Forres on 84.6%.
Forres takes its name from a town called Forres, home to about 10,100 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Forres was Period 11 of 2023-24, at 71.7%, some time before the latest year. The strongest was Period 6 of 2026-27, at 93.0%, and the two are 21.3 percentage points apart. Cancellations peaked at 8.4% of scheduled stops in Period 7 of 2025-26, against 2.4% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Forres on 84.6%. The comparison group includes Elgin (83.1%), Inverness Airport (85.5%) and Nairn (84.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 11,543 | 84.6% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Forres? Delay Repay
These operators call at Forres and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 886 | 78.5% | 2.7% |
| Period 6 of 2026-27 | 886 | 93.0% | 1.7% |
| Period 5 of 2026-27 | 888 | 87.1% | 2.3% |
| Period 4 of 2026-27 | 888 | 85.2% | 2.5% |
| Period 3 of 2026-27 | 888 | 87.5% | 3.4% |
| Period 2 of 2026-27 | 888 | 90.7% | 1.0% |
| Period 1 of 2026-27 | 1,028 | 89.3% | 2.6% |
| Period 13 of 2025-26 | 970 | 86.4% | 2.5% |
| Period 12 of 2025-26 | 887 | 88.6% | 2.0% |
| Period 11 of 2025-26 | 816 | 76.1% | 2.8% |
| Period 10 of 2025-26 | 756 | 81.5% | 3.4% |
| Period 9 of 2025-26 | 874 | 76.6% | 2.3% |
| Period 8 of 2025-26 | 888 | 77.1% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elgin | 11,543 | 83.1% | 2.4% |
| Inverness Airport | 11,543 | 85.5% | 2.3% |
| Nairn | 11,543 | 84.4% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out