Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Duke Street

DSTScotlandManaged by ScotRail

On time, last 13 periods88.1%Great Britain: 83.6%
Cancelled2.1%Great Britain: 3.2%
Stops a day62Scheduled, on average
Punctuality rank731st of 2,374Among ranked stations

How this station is performing

Duke Street had 22,482 scheduled stops to Period 7 of 2026-27, about 62 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.

Duke Street opened on 10 September 1883, 143 years before the latest figures here, and has not been moved since. The First World War closed Duke Street on 1 January 1917, and it reopened on 2 June 1919. Among the 5 stations nearest to it with a known opening date, Bellgrove is the oldest (1871) and Dalmarnock the newest (1895), with Duke Street in between.

The nearest stations to Duke Street are Alexandra Parade (0.6 km north), Bellgrove (0.8 km west), Bridgeton (1.4 km south-west), High Street (Glasgow) (1.7 km west) and Dalmarnock (1.9 km south). 76 stations lie within 10 km in all. Of the five, Alexandra Parade is the most punctual at 90.5% and Bridgeton the least at 86.1%, with Duke Street on 88.1%.

Across the whole run of data, the weakest four-week period for Duke Street was Period 8 of 2024-25, at 81.3%, some time before the latest year. The strongest was Period 1 of 2023-24, at 94.5%, and the two are 13.2 percentage points apart. Cancellations peaked at 7.9% of scheduled stops in Period 8 of 2024-25, against 2.1% over the latest 13 periods.

Compared with 3 stations of a similar size in Scotland, Duke Street is the least punctual, at 88.1%. All of them are ahead, including Alexandra Parade (90.5%), Barnhill (89.1%) and Stepps (91.6%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 94.5%Period 2 of 2023-24: 93.7%Period 3 of 2023-24: 90.0%Period 4 of 2023-24: 93.6%Period 5 of 2023-24: 91.1%Period 6 of 2023-24: 93.2%Period 7 of 2023-24: 88.1%Period 9 of 2023-24: 83.0%Period 10 of 2023-24: 87.2%Period 11 of 2023-24: 89.0%Period 12 of 2023-24: 92.6%Period 13 of 2023-24: 90.6%Period 1 of 2024-25: 91.9%Period 2 of 2024-25: 91.9%Period 3 of 2024-25: 92.0%Period 4 of 2024-25: 91.4%Period 5 of 2024-25: 91.1%Period 6 of 2024-25: 93.7%Period 7 of 2024-25: 92.2%Period 8 of 2024-25: 81.3%Period 9 of 2024-25: 87.3%Period 10 of 2024-25: 89.6%Period 11 of 2024-25: 92.8%Period 12 of 2024-25: 93.2%Period 13 of 2024-25: 94.4%Period 1 of 2025-26: 93.2%Period 2 of 2025-26: 92.7%Period 3 of 2025-26: 92.4%Period 4 of 2025-26: 85.2%Period 5 of 2025-26: 89.7%Period 6 of 2025-26: 92.4%Period 7 of 2025-26: 82.9%Period 8 of 2025-26: 83.8%Period 9 of 2025-26: 86.7%Period 10 of 2025-26: 88.1%Period 11 of 2025-26: 89.7%Period 12 of 2025-26: 90.9%Period 13 of 2025-26: 88.8%Period 1 of 2026-27: 87.5%Period 2 of 2026-27: 88.0%Period 3 of 2026-27: 90.5%Period 4 of 2026-27: 88.6%Period 5 of 2026-27: 89.6%Period 6 of 2026-27: 88.9%Period 7 of 2026-27: 82.7%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 4.0%Period 2 of 2023-24: 1.7%Period 3 of 2023-24: 2.6%Period 4 of 2023-24: 0.8%Period 5 of 2023-24: 0.5%Period 6 of 2023-24: 1.2%Period 7 of 2023-24: 6.0%Period 8 of 2023-24: 3.2%Period 9 of 2023-24: 2.2%Period 10 of 2023-24: 3.7%Period 11 of 2023-24: 1.7%Period 12 of 2023-24: 1.2%Period 13 of 2023-24: 1.3%Period 1 of 2024-25: 3.0%Period 2 of 2024-25: 1.7%Period 3 of 2024-25: 0.7%Period 4 of 2024-25: 4.0%Period 5 of 2024-25: 1.8%Period 6 of 2024-25: 1.1%Period 7 of 2024-25: 0.5%Period 8 of 2024-25: 7.9%Period 9 of 2024-25: 3.2%Period 10 of 2024-25: 1.6%Period 11 of 2024-25: 1.4%Period 12 of 2024-25: 1.1%Period 13 of 2024-25: 1.1%Period 1 of 2025-26: 2.2%Period 2 of 2025-26: 2.0%Period 3 of 2025-26: 0.8%Period 4 of 2025-26: 5.7%Period 5 of 2025-26: 4.3%Period 6 of 2025-26: 1.5%Period 7 of 2025-26: 2.3%Period 8 of 2025-26: 2.9%Period 9 of 2025-26: 3.5%Period 10 of 2025-26: 1.9%Period 11 of 2025-26: 2.5%Period 12 of 2025-26: 1.8%Period 13 of 2025-26: 1.1%Period 1 of 2026-27: 1.6%Period 2 of 2026-27: 1.4%Period 3 of 2026-27: 1.8%Period 4 of 2026-27: 2.5%Period 5 of 2026-27: 1.4%Period 6 of 2026-27: 2.0%Period 7 of 2026-27: 3.3%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail22,48288.1%2.1%

Operators with their own page for this station are linked to it.

Late train at Duke Street? Delay Repay

These operators call at Duke Street and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,71282.7%3.3%
Period 6 of 2026-271,71288.9%2.0%
Period 5 of 2026-271,71289.6%1.4%
Period 4 of 2026-271,71288.6%2.5%
Period 3 of 2026-271,71290.5%1.8%
Period 2 of 2026-271,71288.0%1.4%
Period 1 of 2026-271,97687.5%1.6%
Period 13 of 2025-261,87688.8%1.1%
Period 12 of 2025-261,71290.9%1.8%
Period 11 of 2025-261,71289.7%2.5%
Period 10 of 2025-261,54288.1%1.9%
Period 9 of 2025-261,71286.7%3.5%
Period 8 of 2025-261,68083.8%2.9%

Time of year

75%80%85%90%95%P1: 91.1%1P2: 91.1%2P3: 91.2%3P4: 89.0%4P5: 90.2%5P6: 91.5%6P7: 85.5%7P8: 82.9%8P9: 86.0%9P10: 88.4%10P11: 90.6%11P12: 92.2%12P13: 91.3%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Alexandra Parade22,48290.5%2.7%
Barnhill22,48289.1%2.6%
Stepps22,65891.6%0.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out