Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Alexandra Parade

AXPScotlandManaged by ScotRail

On time, last 13 periods90.5%Great Britain: 83.6%
Cancelled2.7%Great Britain: 3.2%
Stops a day62Scheduled, on average
Punctuality rank484th of 2,374Among ranked stations

How this station is performing

Alexandra Parade had 22,482 scheduled stops to Period 7 of 2026-27, about 62 a day. 90.5% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.

Alexandra Parade opened on 1 July 1881, 145 years before the latest figures here, and has not been moved since. The First World War closed Alexandra Parade on 1 January 1917, and it reopened on 2 June 1919. Among the 5 stations nearest to it with a known opening date, Bellgrove is the oldest (1871) and Bridgeton the newest (1895), with Alexandra Parade in between.

The nearest stations to Alexandra Parade are Duke Street (0.6 km south), Bellgrove (1.1 km south-west), Barnhill (1.8 km north-west), High Street (Glasgow) (1.9 km west) and Bridgeton (1.9 km south-west). 74 stations lie within 10 km in all. At 90.5%, Alexandra Parade is more punctual than every one of them; the best of the five, Barnhill, manages 89.1%.

Across the whole run of data, the weakest four-week period for Alexandra Parade was Period 7 of 2025-26, at 86.8%, some time before the latest year. The strongest was Period 1 of 2023-24, at 96.9%, and the two are 10.1 percentage points apart. Cancellations peaked at 9.5% of scheduled stops in Period 8 of 2024-25, against 2.7% over the latest 13 periods.

1 of 3 stations of a similar size in Scotland are more punctual than Alexandra Parade on 90.5%. The comparison group includes Barnhill (89.1%), Duke Street (88.1%) and Stepps (91.6%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.9%Period 2 of 2023-24: 96.2%Period 3 of 2023-24: 94.0%Period 4 of 2023-24: 96.5%Period 5 of 2023-24: 95.1%Period 6 of 2023-24: 95.3%Period 7 of 2023-24: 94.6%Period 8 of 2023-24: 91.1%Period 9 of 2023-24: 89.2%Period 10 of 2023-24: 92.4%Period 11 of 2023-24: 93.5%Period 12 of 2023-24: 95.4%Period 13 of 2023-24: 95.4%Period 1 of 2024-25: 95.3%Period 2 of 2024-25: 94.5%Period 3 of 2024-25: 95.2%Period 4 of 2024-25: 94.7%Period 5 of 2024-25: 94.4%Period 6 of 2024-25: 95.9%Period 7 of 2024-25: 94.6%Period 8 of 2024-25: 89.4%Period 9 of 2024-25: 91.2%Period 10 of 2024-25: 92.4%Period 11 of 2024-25: 93.5%Period 12 of 2024-25: 92.3%Period 13 of 2024-25: 93.0%Period 1 of 2025-26: 91.5%Period 2 of 2025-26: 91.3%Period 3 of 2025-26: 93.6%Period 4 of 2025-26: 88.3%Period 5 of 2025-26: 91.5%Period 6 of 2025-26: 93.9%Period 7 of 2025-26: 86.8%Period 8 of 2025-26: 86.8%Period 9 of 2025-26: 88.6%Period 10 of 2025-26: 90.4%Period 11 of 2025-26: 91.2%Period 12 of 2025-26: 92.6%Period 13 of 2025-26: 92.1%Period 1 of 2026-27: 90.5%Period 2 of 2026-27: 89.7%Period 3 of 2026-27: 92.4%Period 4 of 2026-27: 90.5%Period 5 of 2026-27: 91.9%Period 6 of 2026-27: 91.3%Period 7 of 2026-27: 87.9%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 4.4%Period 2 of 2023-24: 1.9%Period 3 of 2023-24: 3.1%Period 4 of 2023-24: 1.1%Period 5 of 2023-24: 0.6%Period 6 of 2023-24: 1.3%Period 7 of 2023-24: 4.4%Period 8 of 2023-24: 3.6%Period 9 of 2023-24: 2.6%Period 10 of 2023-24: 4.4%Period 11 of 2023-24: 2.3%Period 12 of 2023-24: 1.4%Period 13 of 2023-24: 1.7%Period 1 of 2024-25: 3.3%Period 2 of 2024-25: 2.0%Period 3 of 2024-25: 0.8%Period 4 of 2024-25: 4.3%Period 5 of 2024-25: 2.2%Period 6 of 2024-25: 1.1%Period 7 of 2024-25: 0.6%Period 8 of 2024-25: 9.5%Period 9 of 2024-25: 3.8%Period 10 of 2024-25: 2.3%Period 11 of 2024-25: 1.6%Period 12 of 2024-25: 1.1%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 2.2%Period 2 of 2025-26: 2.4%Period 3 of 2025-26: 1.0%Period 4 of 2025-26: 6.1%Period 5 of 2025-26: 4.8%Period 6 of 2025-26: 1.5%Period 7 of 2025-26: 2.4%Period 8 of 2025-26: 3.6%Period 9 of 2025-26: 3.9%Period 10 of 2025-26: 2.7%Period 11 of 2025-26: 3.0%Period 12 of 2025-26: 2.5%Period 13 of 2025-26: 1.6%Period 1 of 2026-27: 1.9%Period 2 of 2026-27: 1.7%Period 3 of 2026-27: 2.2%Period 4 of 2026-27: 2.8%Period 5 of 2026-27: 2.1%Period 6 of 2026-27: 2.4%Period 7 of 2026-27: 4.3%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail22,48290.5%2.7%

Operators with their own page for this station are linked to it.

Late train at Alexandra Parade? Delay Repay

These operators call at Alexandra Parade and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,71287.9%4.3%
Period 6 of 2026-271,71291.3%2.4%
Period 5 of 2026-271,71291.9%2.1%
Period 4 of 2026-271,71290.5%2.8%
Period 3 of 2026-271,71292.4%2.2%
Period 2 of 2026-271,71289.7%1.7%
Period 1 of 2026-271,97690.5%1.9%
Period 13 of 2025-261,87692.1%1.6%
Period 12 of 2025-261,71292.6%2.5%
Period 11 of 2025-261,71291.2%3.0%
Period 10 of 2025-261,54290.4%2.7%
Period 9 of 2025-261,71288.6%3.9%
Period 8 of 2025-261,68086.8%3.6%

Time of year

80%90%100%P1: 93.8%1P2: 93.1%2P3: 93.8%3P4: 92.5%4P5: 93.2%5P6: 94.1%6P7: 91.0%7P8: 89.1%8P9: 89.7%9P10: 91.7%10P11: 92.6%11P12: 93.6%12P13: 93.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Barnhill22,48289.1%2.6%
Duke Street22,48288.1%2.1%
Stepps22,65891.6%0.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out