Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Didcot Parkway

All trains at Didcot ParkwayCrossCountry across BritainSouth East

On time, last 13 periods89.7%Whole station: 70.8%
Cancelled3.4%Whole station: 3.4%
Scheduled stops276Of 88,376 at the station

How this operator is doing here

CrossCountry had 276 scheduled stops at Didcot Parkway in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 89.7% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.

CrossCountry trains at Didcot Parkway also serve Oxford (15.9 km north, 59.0% on time, 5.4% cancelled), Reading (25.2 km south-east, 60.3% on time, 5.7% cancelled), Bramley (Hampshire) (33.7 km south, – on time, – cancelled), Basingstoke (39.6 km south, 57.8% on time, 3.8% cancelled), Overton (39.7 km south, – on time, – cancelled) and Banbury (50.3 km north, 53.1% on time, 5.0% cancelled), which are the stations on its network closest to Didcot Parkway.

The busiest CrossCountry station within 30 km of Didcot Parkway is Reading, 25.2 km south-east, with about 46 scheduled stops a day.

Of the 2 operators with enough records at Didcot Parkway, CrossCountry is the most punctual, at 89.7%.

CrossCountry cancels fewer trains at Didcot Parkway than elsewhere: 3.4% of scheduled stops, against 5.9% across its network and 3.4% for every operator at the station.

Alongside CrossCountry, the other operators at Didcot Parkway are Great Western Railway (70.8%, 100% of stops), so passengers here can compare several services.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 78.1%Period 2 of 2023-24: 83.9%Period 3 of 2023-24: 86.5%Period 5 of 2023-24: 95.9%Period 5 of 2024-25: 91.4%Period 12 of 2025-26: 89.7%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 3.6%Period 2 of 2023-24: 6.1%Period 3 of 2023-24: 9.2%Period 5 of 2023-24: 12.1%Period 5 of 2024-25: 0.0%Period 12 of 2025-26: 3.4%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

Other operators at Didcot Parkway

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway88,10070.8%3.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out