Dean (Wilts)
DENSouth WestManaged by South Western Railway
How this station is performing
Dean (Wilts) had 12,380 scheduled stops to Period 7 of 2026-27, about 34 a day. 77.0% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Dean (Wilts) opened on 1 March 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dean (Wilts) is the oldest; the next oldest, Mottisfont and Dunbridge, dates from 1847.
The nearest stations to Dean (Wilts) are Mottisfont and Dunbridge (6.2 km east), Romsey (11.3 km south-east), Salisbury (12.5 km west), Grateley (14.2 km north) and Totton (17.4 km south-east). 1 stations lie within 10 km in all. Of the five, Grateley is the most punctual at 81.8% and Totton the least at 68.7%, with Dean (Wilts) on 77.0%.
Dean (Wilts) is named after West Dean, a Village, home to about 252 people, but the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Dean (Wilts) was Period 9 of 2024-25, at 63.6%, some time before the latest year. The strongest was Period 12 of 2023-24, at 87.5%, and the two are 23.9 percentage points apart. Cancellations peaked at 5.7% of scheduled stops in Period 1 of 2023-24, against 1.7% over the latest 13 periods.
1 of 3 stations of a similar size in South West are more punctual than Dean (Wilts) on 77.0%. The comparison group includes Patchway (80.1%), Cam and Dursley (75.0%) and Honiton (59.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 12,380 | 77.0% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Dean (Wilts)? Delay Repay
These operators call at Dean (Wilts) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 871 | 74.0% | 0.7% |
| Period 6 of 2026-27 | 972 | 78.4% | 0.6% |
| Period 5 of 2026-27 | 972 | 73.5% | 0.7% |
| Period 4 of 2026-27 | 973 | 70.0% | 1.8% |
| Period 3 of 2026-27 | 971 | 76.8% | 3.2% |
| Period 2 of 2026-27 | 948 | 75.4% | 2.6% |
| Period 1 of 2026-27 | 1,059 | 80.7% | 1.0% |
| Period 13 of 2025-26 | 1,070 | 81.3% | 1.0% |
| Period 12 of 2025-26 | 949 | 83.4% | 0.5% |
| Period 11 of 2025-26 | 976 | 80.8% | 4.2% |
| Period 10 of 2025-26 | 892 | 80.5% | 2.8% |
| Period 9 of 2025-26 | 820 | 70.2% | 1.1% |
| Period 8 of 2025-26 | 907 | 74.9% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Patchway | 12,546 | 80.1% | 3.1% |
| Cam and Dursley | 13,209 | 75.0% | 4.4% |
| Honiton | 11,494 | 59.5% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out