Patchway
PWYSouth WestManaged by Great Western Railway
How this station is performing
Patchway had 12,546 scheduled stops to Period 7 of 2026-27, about 34 a day. 80.1% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Patchway opened on 8 September 1863. It was moved to the site it uses now on 10 August 1885. Of the 5 stations nearest to it with a known opening date, Patchway is the oldest; the next oldest, Filton Abbey Wood, dates from 1863.
The nearest stations to Patchway are Bristol Parkway (1.9 km south-east), Filton Abbey Wood (2.5 km south), Ashley Down (5.4 km south), Pilning (5.6 km north-west) and Stapleton Road (6.5 km south). 18 stations lie within 10 km in all. Of the five, Ashley Down is the most punctual at 84.7% and Bristol Parkway the least at 66.2%, with Patchway on 80.1%.
Patchway takes its name from a town called Patchway, home to about 13,777 people, and the station stands 1.9 km from its centre.
Across the whole run of data, the weakest four-week period for Patchway was Period 2 of 2023-24, at 68.8%, some time before the latest year. The strongest was Period 12 of 2025-26, at 87.6%, and the two are 18.8 percentage points apart. Cancellations peaked at 9.7% of scheduled stops in Period 10 of 2023-24, against 3.1% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Patchway is the most punctual, at 80.1%. The comparison group includes Dean (Wilts) (77.0%), Cam and Dursley (75.0%) and Stonehouse (73.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 12,546 | 80.1% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Patchway? Delay Repay
These operators call at Patchway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,004 | 80.9% | 1.8% |
| Period 6 of 2026-27 | 1,003 | 76.9% | 4.2% |
| Period 5 of 2026-27 | 969 | 70.9% | 6.1% |
| Period 4 of 2026-27 | 1,003 | 81.9% | 3.3% |
| Period 3 of 2026-27 | 685 | 78.2% | 5.5% |
| Period 2 of 2026-27 | 721 | 85.8% | 1.1% |
| Period 1 of 2026-27 | 1,154 | 83.0% | 2.4% |
| Period 13 of 2025-26 | 1,100 | 82.5% | 1.5% |
| Period 12 of 2025-26 | 1,005 | 87.6% | 0.8% |
| Period 11 of 2025-26 | 1,003 | 85.9% | 1.4% |
| Period 10 of 2025-26 | 907 | 78.6% | 5.2% |
| Period 9 of 2025-26 | 1,002 | 69.0% | 5.9% |
| Period 8 of 2025-26 | 990 | 78.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dean (Wilts) | 12,380 | 77.0% | 1.7% |
| Cam and Dursley | 13,209 | 75.0% | 4.4% |
| Stonehouse | 13,336 | 73.0% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out