Cam and Dursley
CDUSouth WestManaged by Great Western Railway
How this station is performing
Cam and Dursley had 13,209 scheduled stops to Period 7 of 2026-27, about 36 a day. 75.0% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Cam and Dursley opened on 17 September 1856 and closed to passengers on 4 January 1965. It reopened on 29 May 1994, 32 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Cam and Dursley is the newest; the oldest, Gloucester, opened in 1840.
The nearest stations to Cam and Dursley are Stonehouse (6.3 km north-east), Stroud (Gloucs) (10.1 km east), Lydney (11.8 km west), Gloucester (18.4 km north-east) and Yate (20.2 km south). 1 stations lie within 10 km in all. Of the five, Yate is the most punctual at 77.5% and Stroud (Gloucs) the least at 67.7%, with Cam and Dursley on 75.0%.
Cam and Dursley is named after Dursley, a market town, home to about 7,489 people, but the station stands 4.1 km from its centre.
Compared with 3 stations of a similar size in South West, Cam and Dursley is the most punctual, at 75.0%. The comparison group includes Stonehouse (73.0%), Kemble (65.7%) and Stroud (Gloucs) (67.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 13,209 | 75.0% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Cam and Dursley? Delay Repay
These operators call at Cam and Dursley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,015 | 72.8% | 3.3% |
| Period 6 of 2026-27 | 1,015 | 69.0% | 5.8% |
| Period 5 of 2026-27 | 1,005 | 68.9% | 8.5% |
| Period 4 of 2026-27 | 1,012 | 72.7% | 5.7% |
| Period 3 of 2026-27 | 1,007 | 75.4% | 7.1% |
| Period 2 of 2026-27 | 1,016 | 74.8% | 3.6% |
| Period 1 of 2026-27 | 1,037 | 80.8% | 1.1% |
| Period 13 of 2025-26 | 1,120 | 81.7% | 2.3% |
| Period 12 of 2025-26 | 1,016 | 84.6% | 3.4% |
| Period 11 of 2025-26 | 1,016 | 83.3% | 2.1% |
| Period 10 of 2025-26 | 918 | 74.7% | 4.1% |
| Period 9 of 2025-26 | 1,016 | 60.1% | 7.3% |
| Period 8 of 2025-26 | 1,016 | 74.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stonehouse | 13,336 | 73.0% | 3.4% |
| Kemble | 13,399 | 65.7% | 3.4% |
| Stroud (Gloucs) | 13,409 | 67.7% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out