Dalmeny
DAMScotlandManaged by ScotRail
How this station is performing
Dalmeny had 33,129 scheduled stops to Period 7 of 2026-27, about 91 a day. 81.0% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Dalmeny opened on 1 March 1866. It was moved to the site it uses now on 5 March 1890. Of the 5 stations nearest to it with a known opening date, Dalmeny is the oldest; the next oldest, Inverkeithing, dates from 1877.
The nearest stations to Dalmeny are North Queensferry (3.0 km north), Inverkeithing (5.5 km north), Dalgety Bay (6.3 km north), Edinburgh Gateway (6.3 km south-east) and Rosyth (7.1 km north-west). 8 stations lie within 10 km in all. Of the five, Rosyth is the most punctual at 85.7% and Dalgety Bay the least at 79.2%, with Dalmeny on 81.0%.
Dalmeny takes its name from a Village called Dalmeny, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Dalmeny was Period 8 of 2023-24, at 69.6%, some time before the latest year. The strongest was Period 13 of 2024-25, at 90.6%, and the two are 21.0 percentage points apart. Cancellations peaked at 8.9% of scheduled stops in Period 8 of 2023-24, against 1.6% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Dalmeny on 81.0%. The comparison group includes North Queensferry (82.9%), Falkirk High (93.3%) and Whifflet (79.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 33,129 | 81.0% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Dalmeny? Delay Repay
These operators call at Dalmeny and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,396 | 76.5% | 1.3% |
| Period 6 of 2026-27 | 2,610 | 81.5% | 2.3% |
| Period 5 of 2026-27 | 2,615 | 77.1% | 1.5% |
| Period 4 of 2026-27 | 2,608 | 78.0% | 2.4% |
| Period 3 of 2026-27 | 2,606 | 83.8% | 1.5% |
| Period 2 of 2026-27 | 2,604 | 84.9% | 1.5% |
| Period 1 of 2026-27 | 3,002 | 84.5% | 1.7% |
| Period 13 of 2025-26 | 2,857 | 86.2% | 1.4% |
| Period 12 of 2025-26 | 2,604 | 84.4% | 1.1% |
| Period 11 of 2025-26 | 1,797 | 82.1% | 1.1% |
| Period 10 of 2025-26 | 2,264 | 81.0% | 1.0% |
| Period 9 of 2025-26 | 2,584 | 74.4% | 2.5% |
| Period 8 of 2025-26 | 2,582 | 77.5% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| North Queensferry | 33,129 | 82.9% | 1.6% |
| Falkirk High | 33,214 | 93.3% | 1.5% |
| Whifflet | 32,938 | 79.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out