Dalgety Bay
DAGScotlandManaged by ScotRail
How this station is performing
Dalgety Bay had 23,955 scheduled stops to Period 7 of 2026-27, about 66 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Dalgety Bay opened on 28 March 1998, 28 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Inverkeithing is the oldest (1877) and Dunfermline Queen Margaret the newest (2000), with Dalgety Bay in between.
The nearest stations to Dalgety Bay are Inverkeithing (1.9 km south-west), Rosyth (3.7 km west), North Queensferry (3.7 km south-west), Aberdour (4.4 km east) and Dunfermline Queen Margaret (5.4 km north-west). 9 stations lie within 10 km in all. At 79.2%, Dalgety Bay is less punctual than all of them; the best of the five, Dunfermline Queen Margaret, manages 86.1%.
Dalgety Bay takes its name from a town called Dalgety Bay, home to about 10,050 people, and the station stands 0.1 km from its centre.
Dalgety Bay has slipped a little, from 83.7% within three minutes in the previous 13 periods to 79.2% in the latest 13, a fall of 4.5 percentage points. Cancellations held steady at 1.7% of scheduled stops, against 1.8% before.
2 of 3 stations of a similar size in Scotland are more punctual than Dalgety Bay on 79.2%. The comparison group includes Burntisland (79.0%), Dunfermline Queen Margaret (86.1%) and Cowdenbeath (83.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,955 | 79.2% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Dalgety Bay? Delay Repay
These operators call at Dalgety Bay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,322 | 80.8% | 1.1% |
| Period 6 of 2026-27 | 1,859 | 79.0% | 2.3% |
| Period 5 of 2026-27 | 1,862 | 72.3% | 2.0% |
| Period 4 of 2026-27 | 1,858 | 74.0% | 2.5% |
| Period 3 of 2026-27 | 1,857 | 79.6% | 1.1% |
| Period 2 of 2026-27 | 1,856 | 81.9% | 1.7% |
| Period 1 of 2026-27 | 2,145 | 82.1% | 1.6% |
| Period 13 of 2025-26 | 2,031 | 84.3% | 0.5% |
| Period 12 of 2025-26 | 1,855 | 81.6% | 1.4% |
| Period 11 of 2025-26 | 1,906 | 84.9% | 1.9% |
| Period 10 of 2025-26 | 1,627 | 78.3% | 1.2% |
| Period 9 of 2025-26 | 1,889 | 73.4% | 3.1% |
| Period 8 of 2025-26 | 1,888 | 76.6% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Burntisland | 23,955 | 79.0% | 1.7% |
| Dunfermline Queen Margaret | 23,991 | 86.1% | 1.6% |
| Cowdenbeath | 24,027 | 83.3% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out