GTR at Cricklewood
How this operator is doing here
GTR had 52,624 scheduled stops at Cricklewood in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 72.3% of recorded arrivals came within three minutes and 7.3% of stops were cancelled.
GTR trains at Cricklewood also serve Brent Cross West (1.5 km north-west, 74.0% on time, 7.1% cancelled), West Hampstead Thameslink (1.8 km south-east, 75.5% on time, 6.0% cancelled), Hendon (3.0 km north-west, 75.8% on time, 7.4% cancelled), Kentish Town (5.2 km east, 83.3% on time, 6.8% cancelled), Wembley Central (5.8 km west, 86.3% on time, 6.6% cancelled) and Shepherd's Bush (5.9 km south, 88.0% on time, 5.3% cancelled), which are the stations on its network closest to Cricklewood.
Within 30 km of here, GTR runs best at Birkbeck, 20.4 km south-east (98.1%), and worst at Kenley, 27.2 km south (66.9%).
The busiest GTR station within 30 km of Cricklewood is East Croydon, 22.0 km south, with about 813 scheduled stops a day.
Of the 1 operators with enough records at Cricklewood, GTR is the most punctual, at 72.3%.
Over three full railway years GTR at Cricklewood has got worse each time, from 82.8% within three minutes in 2023-24 to 75.0% in 2024-25 and 74.9% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,118 | 69.8% | 5.8% |
| Period 6 of 2026-27 | 4,083 | 65.6% | 8.4% |
| Period 5 of 2026-27 | 4,132 | 69.5% | 10.3% |
| Period 4 of 2026-27 | 4,073 | 71.0% | 4.8% |
| Period 3 of 2026-27 | 3,392 | 72.1% | 6.5% |
| Period 2 of 2026-27 | 3,792 | 73.9% | 4.8% |
| Period 1 of 2026-27 | 4,599 | 76.4% | 5.6% |
| Period 13 of 2025-26 | 4,506 | 77.2% | 5.8% |
| Period 12 of 2025-26 | 4,202 | 76.1% | 4.9% |
| Period 11 of 2025-26 | 4,163 | 68.7% | 9.8% |
| Period 10 of 2025-26 | 3,410 | 73.3% | 10.5% |
| Period 9 of 2025-26 | 4,057 | 71.6% | 12.1% |
| Period 8 of 2025-26 | 4,097 | 73.7% | 6.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cricklewood
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out